OpenExamsFREE PRACTICE — ANY EXAM

RCDD exam — Information & Free Practice

US · Examination information

200 free questions · Answer explanations · No signup required

Start free practice →

RCDD exam

Provider
Pearson Professional Assessments
Format
Computer-based; multiple-choice, multiple-response, and enhanced-matching items
Exam questions
Total questions: 100; Scored questions: 100.
Time limit
Two and a half hours
Examination outline
  • Define Scope of Project (10%)
    • Identify scope of work and client ICT requirements
    • Design for applicable codes, standards, client requirements and order of precedence
    • Estimate ICT project costs against performance and budget expectations
    • Estimate ICT project timeline against client time frame expectations
  • Design ICT Solutions (63%)
    • Produce ICT design project documentation
    • Locate and size ICT telecommunications spaces
    • Coordinate ICT design with other services
    • Coordinate work area outlet locations
    • Calculate ICT telecommunications space pathways
    • Specify ICT telecommunications space pathway types
    • Specify ICT work area outlet products
    • Specify ICT horizontal transmission media
    • Calculate ICT horizontal pathways
    • Specify ICT horizontal pathway types
    • Coordinate ICT horizontal pathways
    • Specify ICT OSP backbone transmission media
    • Calculate ICT OSP backbone pathways
    • Specify ICT OSP backbone pathway types
    • Coordinate ICT OSP backbone pathways
    • Specify ICT premise backbone transmission media
    • Calculate ICT premise backbone pathways
    • Specify ICT premise backbone pathway types
    • Coordinate ICT premise backbone pathways
    • Incorporate ICT telecommunications space system requirements
    • Advise the electrical engineer on telecommunications space requirements
    • Advise the mechanical engineer on HVAC and plumbing requirements
    • Specify ICT telecommunications space SCS components
    • Design ICT telecommunications spaces
    • Coordinate ICT telecommunications space pathways
    • Produce ICT design documents and bill/list of materials
    • Evaluate ICT design
    • Review ICT design documents with the client
    • Specify ICT grounding, bonding, lightning and surge protection
    • Specify ICT system administration and labeling
    • Specify ICT system testing
    • Specify ICT firestop and penetration requirements
  • Support ICT Bid/Tender Process (11%)
    • Generate ICT RFP or RFQ
    • Respond to ICT RFP or RFQ
    • Generate ICT RFI
    • Respond to ICT RFI
    • Review ICT proposals for completeness
    • Participate in additional bid/tender activities
  • Support ICT Installation Process (16%)
    • Produce ICT submittals for approval
    • Review ICT submittals
    • Revise ICT submittal
    • Participate in ICT materials procurement
    • Coordinate ICT installations with other services
    • Conduct ongoing ICT inspections
    • Conduct final ICT inspections
    • Produce ICT close-out documentation
    • Review ICT close-out documentation with the owner
Examination sources

Related license preparation

This examination may be required or accepted as an alternative, depending on the license and application pathway.