Construction Materials Testing, Asphalt, Level I — Information & Free Practice
US · Examination information
200 free questions · Answer explanations · No signup required
Construction Materials Testing, Asphalt, Level I
- Provider
- Pearson VUE
- Format
- English computer-based knowledge examination at a test center, or remotely proctored via OnVUE for eligible US residents; multiple choice, multiple select and picture-selection responses.
- Exam questions
- Total questions: 110.
- Time limit
- 170 minutes of examination time; the introductory tutorial adds 10 minutes to the appointment and does not extend examination time.
- Passing score
- 500 on NICET's 0–700 scaled-score scale.
Examination outline
The authority publishes percentage ranges for each content area. The practice percentages below use the midpoint of each range, normalized to 100%; they are not exact percentages published by the authority. Practice question counts may differ slightly because of rounding.
Personal and Worksite Safety — Official range: 3–7% (Practice allocation: 5.03%)
- Determine and wear personal protective equipment (PPE).
- Identify and report task-specific hazards.
Plans and Specifications — Official range: 5–15% (Practice allocation: 10.05%)
- Identify locations on site from locations on plans.
Sampling of Asphalt Mixes and Components — Official range: 12–22% (Practice allocation: 17.09%)
- Document sampling locations.
- Follow sampling procedures to obtain samples.
- Compare sampled material to product submittals.
- Label sample origin and material.
- Deliver samples to the laboratory.
Asphalt Mix Sample Preparation — Official range: 8–18% (Practice allocation: 13.07%)
- Reduce/split samples to test size.
- Condition the samples for testing by temperature.
- Label the prepared samples.
Field and Laboratory Testing of Asphalt Mixes and Components — Official range: 35–45% (Practice allocation: 40.2%)
- Perform field density tests of compacted asphalt mixes.
- Perform aggregate gradation tests.
- Perform asphalt content tests of asphalt mixes (e.g., extraction, ignition, and nuclear methods).
- Determine the moisture content of asphalt mixes.
- Determine the moisture content of aggregates.
- Perform the maximum theoretical specific gravity and density tests of asphalt mixes.
- Perform the bulk specific gravity tests of compacted asphalt mixes.
- Perform the fractured face tests of aggregates.
Communication of Results — Official range: 5–15% (Practice allocation: 10.05%)
- Collect required test data for reports.
- Document field observations.
- Complete test forms and related reports.
- Report results to supervisor.
- Assess reasonableness of results
Equipment Calibration and Maintenance — Official range: 1–8% (Practice allocation: 4.52%)
- Verify current calibration for Level I tests
- Verify equipment operation for Level I tests
Examination sources
- NICET Construction Materials Testing Asphalt
Content Outlines heading and linked Level I entry
- NICET Construction Materials Testing Asphalt
What is the Test Like?, controlling scope statement
- NICET Construction Materials Testing Asphalt Level I Content Outline
page 1, Technician Trainee scope statement
- NICET Construction Materials Testing Asphalt Level I Content Outline
page 1, section 1.1, published percentage range
- NICET Construction Materials Testing Asphalt Level I Content Outline
page 1, section 1.2, published percentage range
- NICET Construction Materials Testing Asphalt Level I Content Outline
page 1, section 1.3, published percentage range
- NICET Construction Materials Testing Asphalt Level I Content Outline
page 1, section 1.4, published percentage range
- NICET Construction Materials Testing Asphalt Level I Content Outline
page 1, section 1.5, published percentage range
- NICET Construction Materials Testing Asphalt Level I Content Outline
page 2, section 1.6, published percentage range
- NICET Construction Materials Testing Asphalt Level I Content Outline
page 2, section 1.7, published percentage range
- NICET Construction Materials Testing Asphalt Level I Content Outline
page 2, reference-number footnote
- NICET Construction Materials Testing – Asphalt Level I Selected General References
page 2, standard-edition applicability footnote below ASTM table
- NICET Construction Materials Testing – Asphalt Level I Selected General References
page 3, AASHTO table applicability footnote and additional-reference limitation
- NICET Construction Materials Testing – Asphalt Level I Selected General References
page 3, additional publications introduction and limitation
- NICET Exams
Scoring and Scaled Score
- NICET Construction Materials Testing Asphalt
What to Expect, question response and result format
- NICET Construction Materials Testing Asphalt
What to Expect, Construction Materials Testing - Asphalt table, Level I Exam row
- NICET Exams
Number of Questions and Time Allowed
- NICET Scheduling an Exam
Affidavit, payment and exam authorization
- NICET Scheduling an Exam
Schedule with Pearson Vue, Level I delivery choices
- NICET Exams
Exam eligibility and exception for another program
- NICET Exams
Scheduling
- NICET Online Proctored Exam Requirements and Guidelines
Opening paragraph, OnVUE applicant population
- NICET Exams
Selected General References
- NICET Exams
Testing with ADA Accommodations
Related license preparation
This examination may be required or accepted as an alternative, depending on the license and application pathway.