California-Specific Professional Land Surveyor Examination — Information & Free Practice
US-CA · Examination information
140 free questions · Answer explanations · No signup required
California-Specific Professional Land Surveyor Examination
- Provider
- Prometric
- Format
- Computer-based multiple-choice examination; alternate item types may also appear.
- Time limit
- Four hours
Examination outline
I. Business Practices and Project Management (10%)
- 1. Explain the practice and importance of land surveying to the public
- 2. Prepare proposals and contracts (e.g., scope, schedule, budget, client needs, regulatory requirements)
- 3. Offer or procure land surveying and incidental services
- 4. Direct personnel for office and field tasks
- 5. Coordinate projects with third parties (e.g., agencies, consultants, contractors)
- 6. Identify project standards (e.g., mapping, accuracy requirements, legal requirements, methodology, quality assurance, agency standards, project specifications)
- 7. Develop plan for project execution (e.g., mapping, accuracy requirements, methodology, quality assurance, client needs)
- 8. Preserve survey monuments in accordance with State law
- 9. Manage a land surveying business, organization or department (e.g., compliance with DIR and/or Project Labor Agreement (PLA) regulations, Organizational Record)
- 10. Apply the Subdivision Map Act and other related laws and regulations
- 11. Apply the Professional Land Surveyors Act
- 12. Identify and disclose potential conflicts of interest (e.g., risk, liability, protection)
- A. Professional Land Surveyors' (PLS) Act
- B. Project requirements
- C. Impact of local ordinances
- D. Subdivision Map Act (SMA)
- E. Survey‐relevant sections of State laws (e.g., Public Resources Code, Civil Code, Evidence Code, Department of Industrial Relations (DIR) requirements)
- F. Impact of federal laws (e.g., FEMA, US Army Corps of Engineers, BLM)
- G. Laws and ordinances pertaining to setting of monuments (e.g., PLS Act § 8771‐8772, SMA § 66495‐66498, local ordinances)
- H. Right of entry laws
- I. Capabilities and limitations of equipment and technologies (e.g., GPS, laser scanning, levels, total stations, UAV)
- J. Interpretation of elements in construction plans and specifications pertaining to staking
- K. Procedures for preparation for aerial mapping (e.g. photogrammetric, LiDAR, UAV, flight plans, ground control)
- L. Procedures for preparation for terrestrial mapping (e.g., total station, GPS, LiDAR, cameras)
- M. When records of survey are required
- N. When corner records are required
- O. When tentative, parcel and final maps are required
- P. Map waivers (e.g., SMA § 66428)
- Q. Exceptions to Subdivision Map Act (e.g., SMA § 66412)
- R. State and local agency requirements for maps and related documents (e.g., submittal, review, filing)
- S. Project-specific mapping requirements and criteria
- T. Contractual agreements (e.g., cost estimates, scope of services, limitations)
- U. Appropriate communication methods (e.g., statutory, regulatory)
- V. Scope management (e.g. managing scope-creep, change order processes)
II. Research, Project Planning and Preparation (16%)
- 1. Determine proper control datums, realizations and epochs
- 2. Analyze project data (e.g., recorded maps, deeds, title data, control data, land planning requirements)
- 3. Identify conflicts within documents, maps and drawings
- 4. Conduct project research
- 5. Prepare and review construction calculations (e.g., staking plats, layout, exhibits)
- 6. Perform surveying calculations (e.g., boundary, control, topographic)
- 7. Plan control networks
- 8. Plan field safety operations
- A. Interpretation of elements in construction plans and specifications pertaining to staking
- B. Procedures and requirements for aerial mapping (e.g., photogrammetric, LiDAR, UAV, control, flight plan)
- C. Procedures for preparation for terrestrial mapping (e.g., total station, GPS, LiDAR, photogrammetry)
- D. When records of survey are required
- E. When corner records are required
- F. Public Land Survey System (PLSS)
- G. Sequential conveyances (e.g., senior junior rights)
- H. Simultaneous conveyances (e.g., lot and block)
- I. Water boundaries
- J. Relationship of land grants between private, state and federal (e.g., ranchos, townsites)
- K. Methods of establishing boundaries
- L. Types and components of title documents (e.g., title report, chain of title, lot and block report)
- M. Monument recovery procedures (e.g., field package preparation, search points, magnetic vs. non-ferrous, historic depth)
- N. Easements, rights‐of‐way, leases and other encumbrances
- O. Methods and procedures for retracement and re‐establishment of railroad rights‐of‐way
- P. Controlling elements of legal descriptions
- Q. Strengths and weaknesses of various legal description types
- R. Horizontal and vertical control
- S. Projections, datums, epoch dates, and transformations
- T. Geoid, ellipsoid and orthometric heights
- U. Error sources (e.g., multipath, data input, instrument calibration)
- V. Methods and procedures to produce control networks within accuracy standards (e.g., Public Resources Code, Federal and State standards)
- W. Sources of research data (e.g., public, quasi‐public, private)
- X. Source, type and accuracy of digital data (e.g., metadata, GIS)
- Y. Earth movements (e.g., earthquakes, landslides, subsidence, plate tectonics)
- Z. Safety and hazard evaluations (e.g., CalOSHA, Manual on Uniform Traffic Control Devices)
III. Field Operations and Investigations (20%)
- 1. Perform topographic and/or as‐built surveys
- 2. Perform control surveys
- 3. Perform boundary survey
- 4. Retrace PLSS surveys
- 5. Perform monitoring surveys
- 6. Perform construction staking
- 7. Perform hydrographic surveys (e.g., bathymetric, tidal datum)
- 8. Communicate with clients, contractors and general public while in the field
- 9. Notify right of entry
- 10. Execute safety protocols and procedures
- 11. Perform diligent monument search (e.g., monument preservation, boundary survey, legal requirements)
- 12. Identify limitations of technologies for use in survey practice
- A. Right of entry laws
- B. Capabilities and limitations of equipment and technologies (e.g., GPS, laser scanning, levels, total stations, UAS)
- C. Interpretation of elements in construction plans and specifications pertaining to staking
- D. Public Land Survey System (PLSS)
- E. Monument recovery (e.g., boundary, control and/or topographic surveys)
- F. Monument re‐establishment procedures (e.g., PLS Act 8771 and 8773)
- G. Correct monument identification
- H. Monument pedigree
- I. Horizontal and vertical control
- J. Error sources (e.g., multipath, data input, instrument calibration)
- K. California Coordinate Systems
- L. Real‐time‐networks (e.g., processes, redundancy, accessibility, accuracy)
- M. Field notes and staking reports
- N. Basis of control values and their relation to maps and construction plans (e.g., basis of bearings, benchmark)
- O. Methods and requirements for performing topographic, aerial, as‐built, and/or bathymetric surveys,
- P. Field practices and procedures for construction staking
- Q. Geoid models, ellipsoid heights and orthometric heights
- R. Safety and hazard evaluations (e.g., CalOSHA, Manual on Uniform Traffic Control Devices)
- S. Physical evidence that may indicate unwritten rights (e.g., adverse possession, prescriptive rights)
- T. Physical evidence of water boundaries
IV. Analysis and Evaluation (26%)
- 1. Analyze field evidence together with recorded and unrecorded documentation to retrace boundaries, easements, and possible encroachments (e.g., monuments, occupation, oaths/parol evidence, project documents)
- 2. Evaluate accuracies and precisions of historic documents and maps versus measured survey data
- 3. Evaluate relevance and spatial relationships of maps and measured survey data (e.g., GIS data, field data, metadata)
- 4. Assess boundary location conflicts
- 5. Assess title conflicts
- 6. Analyze results of survey adjustments (e.g., least squares, error analysis)
- 7. Perform quality assurance and quality control
- 8. Reconcile deed descriptions with field evidence
- 9. Identify limitations of technologies for use in survey practice
- A. When records of survey are required
- B. When corner records are required
- C. Public Land Survey System (PLSS)
- D. Water boundaries (e.g., tidal datums, navigable vs non‐navigable)
- E. Hierarchy of evidence (e.g., Code of Civil Procedure 2077)
- F. Boundary resolution of simultaneous conveyances
- G. Boundary resolution of sequential conveyances
- H. Boundary resolution of junior senior rights
- I. Boundary resolution of deed descriptions
- J. Evaluation of field evidence
- K. Types of conveyances and their effects of ownership on property (e.g., fee vs. easement, grant deed, quitclaim deed, intent)
- L. Cloud on title
- M. Effect of earth movement on boundaries (e.g., earthquakes, landslide, subsidence, continental drift)
- N. Easements, rights‐of‐way, leases and other encumbrances
- O. Criteria for acceptance or rejection of monuments
- P. Physical evidence that may indicate unwritten rights (e.g., adverse possession, prescriptive rights)
- Q. Controlling elements of legal descriptions
- R. Types of legal descriptions (e.g., strip, metes and bounds, lot and block, aliquot)
- S. Exceptions and reservations of legal descriptions
- T. Horizontal and vertical control
- U. Projections, datums, realizations and epoch dates
- V. Geoid, ellipsoid and orthometric heights
- W. Conversion between grid and ground distances
- X. Errors - Analysis and quantification (e.g., data bias, error ellipses, residuals)
- Y. Digital terrain models
- Z. Point clouds (e.g., As-Built, reduction, management, analysis, extraction, terrain classification systems)
- AA. Applications of relevant case law (e.g., boundary issues, liability)
- BB. Methods to obtain bearings or azimuths related to geodetic, magnetic, grid or astronomic north
- CC. Parol evidence
- DD. Use and interpretation of significant figures for maps, plats or reports
- EE. Survey‐relevant sections of state laws (e.g., Public Resources Code, Civil Code, Evidence Code)
- FF. Historical accuracies vs. current precision (e.g., measuring by chaining, EDM, GPS)
V. Mapping and Document Preparation (16%)
- 1. Prepare legal descriptions (e.g., easements, lot line adjustments, other interests in real property)
- 2. Ensure survey documents comply with State laws, project requirements, and contractual obligations
- 3. Prepare and analyze 3D Models (e.g., BIM, DTM, point clouds)
- 4. Prepare topographic maps from various sources (e.g., photogrammetry, field survey, LiDAR, GIS, UAS, hydrographic)
- 5. Prepare control maps or reports (e.g., local, geodetic, monitoring)
- 6. Prepare maps, plats and exhibits (e.g., court, easement, ALTA/NSPS, boundary)
- 7. Prepare State regulated maps, plats, exhibits (e.g., records of survey, corner records, lot line adjustments, subdivision maps, condominium plans, LAFCO)
- 8. Prepare construction reports (e.g., cut‐sheets, plots, verification reports, quality assurance, ADA reports, form/pad certifications)
- A. Professional Land Surveyors' (PLS) Act
- B. Subdivision Map Act (SMA)
- C. ALTA/NSPS Land Title Survey related to State law
- D. Basis of control elements and their relation to maps (e.g., basis of bearings, benchmark)
- E. Strip legal descriptions
- F. Metes and bounds legal descriptions
- G. Aliquot part legal descriptions
- H. Portions and parts legal descriptions
- I. Exceptions and reservations in legal descriptions
- J. Projections, datums and epoch dates
- K. California Coordinate System
- L. Surveyor notes (e.g., boundary narrative)
- M. Surveyor reports (e.g., volume, staking)
- N. Digital terrain models
- O. Parol evidence (e.g., use, methods to document, and effects)
- P. Code of Regulations (Board Rules)
- Q. Public Resource Code (PRC)
- R. Signing and sealing requirements
- S. Components of a legal description (e.g., preamble, body)
- T. Methods and procedures for preparing topographic maps (e.g., photogrammetric, planimetric)
- U. Elements of corner records (legal content required)
- V. Elements of records of survey (legal content required)
- W. Elements of tentative maps (legal content required)
- X. Elements of parcel maps (legal content required)
- Y. Elements of final maps (legal content required)
- Z. Elements of certificates of compliance (legal content required)
- AA. Certificates of correction and amended maps
- BB. Depiction of physical evidence that may indicate unwritten rights
- CC. Easements, rights‐of‐way, leases and other encumbrances
VI. Professional Consulting (12%)
- 1. Communicate accuracies of maps or survey data (e.g., professionals, clients, staff)
- 2. Provide expert witness testimony (e.g., depositions, arbitration, trials, litigation support)
- 3. Provide land planning services (e.g., tentative maps, Department of Real Estate exhibits)
- 4. Provide recommendations in accordance with State Laws (e.g., Subdivision Map Act, Professional Land Surveyors Act, Public Resources Code)
- 5. Conduct independent peer review
- 6. Provide conflict resolution
- 7. Apply code of professional conduct
- 8. Recognize risk awareness and general liability
- A. Professional Land Surveyors' (PLS) Act
- B. Subdivision Map Act (SMA)
- C. Impact of local ordinances (e.g., zoning, setbacks)
- D. State and local agency processing requirements for maps and related documents (e.g., submittal, review, filing)
- E. Appropriate communication methods (e.g., verbal and written)
- F. Effects of unwritten rights on boundaries
- G. Effects of riparian and littoral rights on boundaries
- H. Cloud on title
- I. Effects of earth movement on boundaries (e.g., earthquakes, subsidence, slides)
- J. Impacts of encumbrances (e.g., deeds of trust, tax liens, easements, leases)
- K. Evidence that may indicate unwritten rights (e.g., adverse possession, prescriptive rights)
- L. Effects of relevant case law (e.g., boundary issues, liability)
- M. Notice of potential encroachments
- N. Survey‐relevant sections of state laws (e.g., Public Resources Code, Civil Code, Evidence Code, CEQA, Categorical Exemption, Negative Declaration)
- O. Surveyor's role in title and boundary conflicts (e.g., analysis, mediation, litigation support)
- P. Code of professional conduct (BR 476)
- Q. Mediation techniques
Examination sources
- California-Specific Professional Land Surveyor Examination Test Plan
Page 1 — scope, effective date and six primary content areas
- https://www.bpelsg.ca.gov/applicants/candidate_info.shtml
State Specific Land Surveyor Examination — Exam Format
- Prometric California Professional Land Surveyor Candidate Information Bulletin
Page 7, Your exam results — question scoring
- https://www.bpelsg.ca.gov/applicants/applying_for_pls.shtml
Application Submittal Process — state-specific exam eligibility
- https://www.bpelsg.ca.gov/applicants/candidate_info.shtml
State Specific Land Surveyor Examination — Scheduling
Related license preparation
This examination may be required or accepted as an alternative, depending on the license and application pathway.