Try these 10 sample questions from the Washington Well Operator Written Examination practice bank. Each includes the answer and explanation. Continue with the interactive practice above to review the full question set.
1Before constructing a water well that requires a Washington water-right permit, what must the operator have at the well site?
- A.A copy of the water-right permitCorrect answer: A
- B.The county tax assessment
- C.A pump installer affidavit
- D.A recorded access easement
2During construction, how must a driller treat confining layers between aquifers?
- A.Remove them to increase yield
- B.Perforate them at five-foot intervals
- C.Preserve them so the well does not interconnect aquifersCorrect answer: C
- D.Replace them with filter-pack material
3Which well must be decommissioned under Washington's minimum standards?
- A.A properly maintained well in seasonal use
- B.An abandoned well that is no longer intended for useCorrect answer: B
- C.A tagged well awaiting a pump
- D.A new well before its water-quality result arrives
4In what type of formation may a liner generally be installed?
- A.Unconsolidated sand formation
- B.Unconsolidated gravel formation
- C.Consolidated rock formationCorrect answer: C
- D.Low-conductivity confining formation
5Which sedimentary rock is composed mainly of cemented gravel and sand?
6A public water-supply well is ready for its required pumping test. What minimum continuous duration applies?
7On which official filing must the operator report required well-yield test results?
- A.Notice of intent
- B.Water well reportCorrect answer: B
- C.Variance request
- D.Operator license-renewal application
8How many sections are normally contained in a Public Land Survey System township?
9Which activity meets the rule's definition of artificial groundwater recharge?
- A.Injecting water through a well to add it to an aquiferCorrect answer: A
- B.Pumping groundwater from a production well
- C.Measuring the static level in an observation well
- D.Sealing an abandoned well with bentonite
Explanation: The rule defines artificial recharge as "the addition of water to an aquifer by activities of man, such as irrigation or induced infiltration from streams, or injection through wells, trenches, pits, and ponds." Injecting water to add it to an aquifer therefore matches option A.
Reference: Wac 173 160 — WAC 173-160-111, definition of artificial recharge
10Before constructing a well intended as a public water-supply source, what site action is required?
- A.Obtain Department of Health site approvalCorrect answer: A
- B.Complete the well before notifying any agency
- C.Obtain only a pump installer permit
- D.Record a mineral-right deed
Topics in this practice bank
These topics describe the available practice for Washington Well Operator Written Examination. Review the examination outline and its sources for scope and allocation details.
- Washington state groundwater laws as they relate to constructing and decommissioning wells
- Sanitary standards for constructing wells
- Types of well construction and decommissioning
- Drilling techniques, tools and equipment
- Geology (including soil and rock description) as it relates to well construction
- Rules and regulations of the department relating to constructing a well, test pumping, and equipment maintenance
- Preparation of intent forms, well reports, and requests for variances
- Township and range location system as it relates to location of wells
- Basic groundwater hydraulics as it relates to well construction and protection of the resource
- Rules and regulations of the Washington state department of health relating to source approval and source protection of public drinking water systems
How to use these free practice questions
Choose an answer, check the explanation, and review your progress by chapter. Practice questions and explanations are free to access without signing up.
These are independent study questions, not actual examination items. For examination requirements and official information, view Washington Well Operator Written Examination details.