Free NICET Construction Materials Testing - Soils - Level IV Exam Practice Questions
200 free questions · Answer explanations · No signup required
View examination details, outline and sourcesLoading selected examination banks…
Sample Practice Questions
Try these 10 sample questions from the NICET Construction Materials Testing - Soils - Level IV Exam practice bank. Each includes the answer and explanation. Continue with the interactive practice above to review the full question set.
1A soils laboratory's internal safety meeting includes technicians who cannot understand the language used in the existing training. What change follows OSHA's program-awareness guidance?
- A.Provide training in language and literacy levels the technicians understand.Correct answer: A
- B.Retain the existing language if the technicians sign attendance records.
- C.Retain the existing language if a supervisor signs the training records.
- D.Provide translated training only after the next annual program audit.
Explanation: OSHA states, "Ensure that training is provided in the language(s) and at a literacy level that all workers can understand.". Attendance signatures do not establish comprehension; the training itself must be understandable.
Reference: OSHA Education and Training — Action item 1: Provide program awareness training
2A senior soils technician is preparing the total cost estimate for a geotechnical investigation using FHWA's major-project guidance. The project has spent $170,000 and needs another $80,000 to finish the defined scope. What total project cost should be reported?
- A.$80,000
- B.$90,000
- C.$170,000
- D.$250,000Correct answer: D
Explanation: FHWA states, "Although this guidance will focus on developing a cost to complete cost estimate, include both expended and future costs when presenting the total cost of a project." Total cost = expended cost + future cost = $170,000 + $80,000 = $250,000. $80,000 reports only remaining work; $170,000 omits it; $90,000 subtracts instead of adding. All amounts are dollars and no rounding is needed.
Reference: FHWA Major Project Program Cost Estimating Guidance — Key Principles / Contents of a Cost Estimate
3A laboratory must determine consolidation behavior of a soft clay foundation. Which sampling objective should the field program prioritize?
- A.Preserving the soil's natural structure in an undisturbed sample.Correct answer: A
- B.Obtaining a disturbed bulk sample for particle-size analysis.
- C.Obtaining cuttings for visual identification of soil types.
- D.Obtaining a disturbed sample for moisture-density testing.
Explanation: FHWA states, "Undisturbed samples are obtained where necessary to determine the in-place stiffness and strength, compressibility (settlement), natural moisture content, unit weight, permeability, discontinuities, fractures, and fissures of subsurface formations." Compressibility depends on the condition of the soil structure. The other sample objectives support identification or remolded-material tests rather than preserving the deposit's consolidation behavior.
Reference: FHWA Geotechnical Aspects of Pavements Reference Manual — 4.5.6, Borings and Sampling
4Field sample B-7/12-14 ft becomes laboratory sample L-208. Which pair of identifier types should appear on the subcontracted test request under FHWA sample-tracking guidance?
- A.Field sample ID and sampler equipment ID.
- B.Laboratory sample ID and shipment tracking ID.
- C.Field sample ID and laboratory sample ID.Correct answer: C
- D.Test-method ID and testing technician ID.
Explanation: FHWA states, "When laboratory testing is requested, both the field identification number and the laboratory identification number should be used on the request form." Here those identifiers are B-7/12-14 ft and L-208. Equipment, shipment, method, and personnel identifiers serve other recordkeeping functions; none substitutes for the required field-to-laboratory sample link.
Reference: FHWA Soils and Foundations Reference Manual, Volume I — 5.1.1, p. 5-2
5A static compression pile test uses anchor piles to react the hydraulic jack load. What loading condition must the anchor piles resist?
- A.Compression
- B.Bending
- C.TensionCorrect answer: C
- D.Torsion
Explanation: The reference states, "The reaction force is transferred to the anchor piles that go into tension in the case of a static load test in compression; or into compression in the case of a static load test in tension." The compression force on the test pile produces an opposite reaction that pulls on the anchors. Compression is the anchor response for a tension test; lateral bending and torsion are different load actions.
Reference: Caltrans Foundation Manual, Chapter 8 — 8-2.1, p. 8-2
6A subgrade passes the specified density tests but yields visibly under proof rolling. What does the observation establish?
- A.The density test necessarily used the wrong specimen mass.
- B.The weak response may remain despite meeting density requirements.Correct answer: B
- C.The proof roller must be lighter than the compaction roller.
- D.The layer necessarily contains more than the permitted fines.
Explanation: FHWA states, "This practice is good for detecting soft zones that may have passed the density requirements of the project, but not necessarily the moisture content, and can detect problems that could extend many feet below the tested surface." Proof rolling evaluates load response, which a passing density alone does not establish. The observation warrants investigation; it does not by itself prove a mass error, roller mismatch, or excess fines.
Reference: FHWA Geotechnical Aspects of Pavements, Chapter 8 — QC/QA: Tradition Methods / Proof Rolling
7A wet soil specimen weighs 250 g without its container and 200 g after drying. What is its gravimetric water content?
- A.20%
- B.25%Correct answer: B
- C.80%
- D.125%
Explanation: FHWA states, "w = Ww / Ws, where Ww is the weight of water and Ws is the weight of the soil solids in the sample." Water mass = 250 − 200 = 50 g. Water content = 50/200 × 100 = 25%. Twenty percent uses wet mass as denominator; 80% is the dry fraction of wet mass; 125% divides wet mass by dry mass.
Reference: FHWA Geotechnical Aspects of Pavements, Chapter 5 — 5.3.2, Table 5-11
8A laboratory is preparing to seek AASHTO accreditation. Which QMS milestone must be reached before requesting accreditation?
- A.Draft the QMS before applying and implement it after accreditation.
- B.Implement a conforming QMS before requesting accreditation.Correct answer: B
- C.Begin implementation at the assessment and document it after the award.
- D.Draft the QMS after the first assessment and implement it before the next.
Explanation: The procedure states, "Before requesting accreditation, the laboratory shall establish, implement, and maintain a quality management system which meets the requirements specified in AASHTO R 18" The system must operate and meet applicable requirements before the request. Document appearance, purchasing alone, and waiting for a certificate do not establish an implemented system.
Reference: AASHTO Accreditation Program Procedures Manual — 7.2.1
9Technicians report that field hazards are raised at meetings but never receive a response. Which communication practice should the supervisor establish?
- A.Use an annual workforce survey as the response to individual concerns.
- B.Send receipt numbers without updates on action taken.
- C.Give regular feedback on how reported concerns are being addressed.Correct answer: C
- D.Maintain attendance records without reporting follow-up actions.
Explanation: The guidance states, "Provide frequent and regular feedback to show employees that their safety and health concerns are being heard and addressed." Regular feedback describes disposition of the reported concerns. A survey, receipt number, or attendance record does not itself tell workers how those concerns are being addressed.
Reference: OSHA Recommended Practices: Worker Participation — Action item 5, Remove barriers to participation
10A technician who already performs several soils tests is assigned a newly introduced test method. What training is required before performing that new method?
- A.Apply the training record for the closest related method.
- B.Provide training in the newly assigned method.Correct answer: B
- C.Accept general soils experience as the new method's training.
- D.Use the next assessment as the new method's initial instruction.
Explanation: The guidance states, "existing staff shall be trained in any new test methods that are added to the scope of what they are expected to perform." Experience or instruction in other work does not replace training on the newly assigned method. The required instruction should not be postponed until an external assessment.
Reference: AASHTO Accreditation Policy and Guidance on Training and Competency Evaluation — Training Requirements, p. 1
Exam Review
About NICET Construction Materials Testing - Soils - Level IV Exam
NICET Construction Materials Testing - Soils - Level IV Exam · US
Key exam facts
- Provider
- NICET (National Institute for Certification in Engineering Technologies) owns and administers the examination program; Pearson VUE delivers the computer-based test at proctored testing centers.
- Format
- Computer-based knowledge examination at a proctored test center; multiple-choice and multiple-select questions, with some picture-selection responses. Listed bound references are permitted subject to NICET restrictions; specified AASHTO titles are supplied on-screen.
- Exam questions
- Total questions: 90.
- Time limit
- 315 minutes of examination time, plus a separate 10-minute introductory tutorial. Unscheduled breaks do not stop the examination clock; the Level IV row is not marked for a scheduled 30-minute break.
- Passing score
- A scaled score of 500 or higher passes on NICET's 0-700 scale; scores below 200 are reported as 200.
- Exam fee
- US$435 for the Standard Model/CBT Level IV application, effective August 1, 2026; no state or local taxes are added and fees are subject to change. Rescheduling within 24 hours after the scheduled date or into a new testing window incurs an additional half of the original testing fee.
Topics covered
The authority publishes percentage ranges for each content area. The practice percentages below use the midpoint of each range, normalized to 100%; they are not exact percentages published by the authority. Practice question counts may differ slightly because of rounding.
Personal and Worksite Safety — Official range: 1–9% (Practice allocation: 5%)
- Lead internal safety meetings.
Plans and Specifications — Official range: 10–20% (Practice allocation: 15%)
- Develop project budgets and estimates.
Sampling of Soils — Official range: 1–9% (Practice allocation: 5%)
- Create a complex soil sampling program.
Soils Sample Preparation — Official range: 1–9% (Practice allocation: 5%)
- Oversee sample preparation activities performed by Level I, II, or III technicians.
Field Testing of Soils — Official range: 1–9% (Practice allocation: 5%)
- Perform shear test.
- Perform complex (high load) pile load tests.
Laboratory Testing of Soils — Official range: 1–9% (Practice allocation: 5%)
- Calculate mix proportions for soils stabilization projects.
- Interpret soils test results.
- Prepare geotechnical reports.
Field Observation of Soils Construction Operations — Official range: 1–9% (Practice allocation: 5%)
- Resolve soils field problems.
Evaluation of Soils Test Results — Official range: 10–20% (Practice allocation: 15%)
- Perform preliminary interpretation of test data.
- Troubleshoot and identify suspect soils test data.
Quality System — Official range: 15–25% (Practice allocation: 20%)
- Create soils testing laboratory quality system.
- Approve and schedule outside vendors for equipment calibration.
- Manage soils laboratory accreditation.
- Create record keeping system for equipment calibration and maintenance activities.
Reporting and Supervision — Official range: 5–15% (Practice allocation: 10%)
- Resolve communication and related work conflicts.
- Finalize soils test reports.
- Develop preliminary recommendations for Engineer in Charge.
- Manage company resources (e.g., employees, schedules, budget, equipment).
Training — Official range: 5–15% (Practice allocation: 10%)
- Train Level I, II, and III technicians for field and laboratory testing.
- Verify and document technician proficiency and training activities.
How to prepare
Work through the topics, read the explanation after each answer, and revisit the areas where you miss questions. Use the official outline and reference materials below to guide your study.
These independent practice questions are not actual exam items and do not guarantee a passing result.
Frequently asked questions
What is the exam format?
Computer-based knowledge examination at a proctored test center; multiple-choice and multiple-select questions, with some picture-selection responses. Listed bound references are permitted subject to NICET restrictions; specified AASHTO titles are supplied on-screen.
How many questions are on the exam?
Total questions: 90.
How long is the exam?
315 minutes of examination time, plus a separate 10-minute introductory tutorial. Unscheduled breaks do not stop the examination clock; the Level IV row is not marked for a scheduled 30-minute break.
What is the passing score?
A scaled score of 500 or higher passes on NICET's 0-700 scale; scores below 200 are reported as 200.
How much does the exam cost?
US$435 for the Standard Model/CBT Level IV application, effective August 1, 2026; no state or local taxes are added and fees are subject to change. Rescheduling within 24 hours after the scheduled date or into a new testing window incurs an additional half of the original testing fee.
Official sources and references
- Construction Materials Testing Soils
What is the Test Like?
- Construction Materials Testing Soils Level IV Content Outline
pages 1-2 / all eleven sections, tasks, role statement and footnote
- Construction Materials Testing – Soils Level IV Selected General References
pages 1-3 / full title/edition tables and footnotes
- NICET Exams
Scoring and Scaled Score
- Construction Materials Testing Soils
What is the Test Like? / response formats
- NICET Exams
Number of Questions and Time Allowed
- Construction Materials Testing Soils
What to Expect / Level IV row
- Construction Materials Testing Soils
Test Time
- Construction Materials Testing Soils
Pricing / Standard Model Programs table
- Construction Materials Testing Soils
Pricing / conditions
- Construction Materials Testing Soils
Pricing / rescheduling fee condition
Confirm current exam arrangements with the exam provider.