Free NICET Construction Materials Testing - Asphalt Level II Exam Practice Questions
200 free questions · Answer explanations · No signup required
View examination details, outline and sourcesLoading selected examination banks…
Sample Practice Questions
Try these 10 sample questions from the NICET Construction Materials Testing - Asphalt Level II Exam practice bank. Each includes the answer and explanation. Continue with the interactive practice above to review the full question set.
1An asphalt technician is helping document the steps for a job hazard analysis of an aggregate testing operation. How should the initial job-step record be organized?
- A.In the sequence observed while the worker performs the operationCorrect answer: A
- B.In descending order of the estimated severity of each possible injury
- C.Grouped by the types of controls proposed for the hazards
- D.In descending order of the estimated likelihood of each incident
Explanation: OSHA states: "When beginning a job hazard analysis, watch the employee perform the job and list each step as the worker takes it." The initial breakdown follows actual work order. Risk ranking and grouping controls are different analytical activities and do not replace that sequence.
Reference: OSHA Job Hazard Analysis — Printed page 5 / Outline the steps or tasks
2A technician plans testing for an airport project adopting the Marshall alternative in P-401 of AC 150/5370-10G. Which test determines both the load resistance and deformation of the compacted specimens?
- A.ASTM D2041
- B.ASTM D6927Correct answer: B
- C.ASTM D3665
- D.ASTM D979
Explanation: The specification states, "Sample specimens shall be tested for stability and flow in accordance with ASTM D6927.". D6927 determines stability and flow. D2041 concerns theoretical maximum specific gravity, D3665 random sampling, and D979 sample collection.
Reference: FAA Standards for Specifying Construction of Airports — Printed p. 239
3A technician selects aggregate sampling sites for a lot. Which selection basis minimizes personal selection bias?
- A.Choose sites entirely by chanceCorrect answer: A
- B.Choose the easiest sites to reach
- C.Choose sites with the smoothest visible texture
- D.Choose sites having the most uniform appearance
4A coarse-aggregate sample has saturated internal pores but no visible water film. Which condition should the technician record?
- A.Oven-dry
- B.Air-dry
- C.Saturated surface-dryCorrect answer: C
- D.Wet with surface water
Explanation: The condition is SSD. The definition states: "Saturated Surface Dry (SSD) – condition of an aggregate particle when the permeable voids are filled with water, but no water is present on exposed surfaces." Oven-dry and air-dry conditions lack full pore saturation; a wet-surface condition retains external water.
Reference: WSDOT FOP for AASHTO T 85 — FOP T 85, Terminology, p. 1
5A compacted asphalt specimen has Gmb=2.400 and its loose mixture has Gmm=2.500. What air-void content results?
- A.4.0%Correct answer: A
- B.4.2%
- C.10.0%
- D.96.0%
Explanation: The displayed VTM equation is 100 × (Gmm − Gmb)/Gmm. Thus 100 × (2.500 − 2.400)/2.500 = 4.0%. Dividing by Gmb instead gives 4.2%; multiplying only the gravity difference by 100 gives 10%; reporting Gmb/Gmm gives 96%. The source states: "The air voids determination is a relationship between maximum specific gravity (Gmm) and Gyratory bulk specific gravity (Gmb @Ndes)."
Reference: NCDOT QMS Asphalt Manual — Section 7.18.2(A), p. 7-57
6An inspector is checking temperature in an uncompacted asphalt mat behind the paver. Where is the thermometer stem inserted for the described measurement?
- A.At the exposed surface
- B.At the mat's mid-depthCorrect answer: B
- C.At the base-to-mat interface
- D.At one-quarter of the mat depth
Explanation: The measurement is taken within the mat at its midpoint, rather than at a surface that can cool more rapidly. The manual states: "inserting the thermometer stem into the uncompacted mat to the mid-point of the mat's thickness"
Reference: FHWA Asphalt Pavement Inspection Manual — Printed p. 208
7A coarse-aggregate specific-gravity calculation gives 2.6546. Using T 85's stated reporting precision, what value is entered in the report?
- A.2.65
- B.2.654
- C.2.655Correct answer: C
- D.2.66
8A No. 200 sieve must be cleaned under the cited sieve-care procedure. Which implement is specified?
- A.A brass wire brush
- B.A stiff short-bristle stencil brush
- C.A small paintbrushCorrect answer: C
- D.A rounded wooden brush handle
Explanation: The fine mesh is easily damaged, so the cited method specifies a small paintbrush. The other tools serve coarser meshes or different cleaning tasks. The source states: "No. 200 sieves: Clean only by brushing with a small paintbrush."
Reference: Caltrans Sieve Analysis of Fine and Coarse Aggregates — Section J.1(d), p. 8
9During an asphalt laboratory JHA, a technician reports a recent near miss that caused neither injury nor equipment damage. What does that event indicate about the existing hazard controls?
- A.They merit closer scrutiny because the event may reveal inadequacyCorrect answer: A
- B.They merit a lower risk rating because the event caused no loss
- C.They merit acceptance as effective because the worker avoided injury
- D.They merit removal from the review because no repair was required
Explanation: OSHA states, "These events are indicators that the existing hazard controls (if any) may not be adequate and deserve more scrutiny.". A near miss can reveal a control weakness even without an actual loss. Lack of injury or repair does not validate the controls.
Reference: OSHA Job Hazard Analysis — Printed page 4 / Review your accident history
10For an airport project using P-401 of AC 150/5370-10G, a technician needs the mixture property used with compacted bulk specific gravity to determine air voids. Which additional test is specified?
- A.Random sampling by ASTM D3665
- B.Thickness measurement by ASTM D3549
- C.Theoretical maximum specific gravity by ASTM D2041Correct answer: C
- D.Marshall stability and flow by ASTM D6927
Explanation: The specification states, "For air voids determination, the theoretical maximum specific gravity of the mixture shall be measured one time for each sublot in accordance with ASTM D2041.". Theoretical maximum specific gravity supplies the no-air-void reference. Random sampling, thickness and load/deformation tests do not supply that reference.
Reference: FAA Standards for Specifying Construction of Airports — Printed p. 240
Exam Review
About NICET Construction Materials Testing - Asphalt Level II Exam
NICET Construction Materials Testing - Asphalt Level II Exam · US
Key exam facts
- Provider
- NICET (National Institute for Certification in Engineering Technologies) owns the examination; Pearson VUE administers the computer-based test.
- Format
- Proctored computer-based knowledge examination at a test center, primarily multiple choice and multiple select; picture-click questions may also occur. The optional hands-on performance examination is separate.
- Exam questions
- Total questions: 165.
- Time limit
- 365-minute listed session including the scheduled 30-minute break, leaving 335 minutes to answer questions. A separate 10-minute introductory tutorial extends the appointment; unused tutorial time does not extend answering time.
- Passing score
- 500 on the 0–700 scaled-score scale; scores at or above 500 are reported as Pass.
- Exam fee
- US program Standard Model/CBT Level II application fee: $325, effective August 1, 2026. Do not add state or local taxes; fees are subject to change. Rescheduling charges may apply under the published conditions.
Topics covered
The authority publishes percentage ranges for each content area. The practice percentages below use the midpoint of each range, normalized to 100%; they are not exact percentages published by the authority. Practice question counts may differ slightly because of rounding.
Personal and Worksite Safety — Official range: 1–9% (Practice allocation: 5%)
- Apply job hazards analysis (JHA).
- Review safety data sheets (SDS).
Plans and Specifications — Official range: 5–15% (Practice allocation: 10%)
- Determine what testing is needed on samples.
- Determine sampling frequencies.
Sampling of Asphalt Mixes and Components — Official range: 1–9% (Practice allocation: 5%)
- Determine sampling locations
- Establish sampling procedures
Aggregate Testing for Asphalt Mixes — Official range: 20–30% (Practice allocation: 25%)
- Perform unit weight tests.
- Perform coarse aggregate specific gravity tests.
- Perform fine aggregate specific gravity tests.
- Perform sand equivalent tests.
- Perform sieve analyses of mineral fillers.
- Perform (run, calculate, report) flat and elongated particles tests.
- Perform LA abrasion tests.
- Perform clay lumps and friable particles tests.
- Perform fine aggregate angularity (uncompacted void content) tests.
- Perform sulphate soundness tests.
- Perform durability index tests.
- Perform Micro-Deval tests.
Asphalt Mix Testing — Official range: 23–33% (Practice allocation: 28%)
- Determine void contents.
- Determine height of compacted asphalt samples.
- Perform gyratory compactions.
- Perform Marshall compactions.
- Calculate asphalt mix volumetrics.
- Perform Marshall stability and flow tests.
- Perform Hveem stability tests.
- Perform Hveem compactions.
- Perform drain down tests.
Asphalt Mix Production and Placement — Official range: 10–20% (Practice allocation: 15%)
- Identify issues in mix placements.
- Identify issues of mix productions.
- Establish roller patterns.
- Monitor asphalt plant productions.
- Identify asphalt paving equipment.
Communication of Results — Official range: 1–9% (Practice allocation: 5%)
- Prepare lab or field test data for reports.
- Verbally report preliminary test results to clients or contractors.
Equipment Calibration and Maintenance — Official range: 2–12% (Practice allocation: 7%)
- Maintain test equipment.
- Perform equipment verifications.
- Verify equipment maintenance.
- Perform equipment calibrations.
How to prepare
Work through the topics, read the explanation after each answer, and revisit the areas where you miss questions. Use the official outline and reference materials below to guide your study.
These independent practice questions are not actual exam items and do not guarantee a passing result.
Frequently asked questions
What is the exam format?
Proctored computer-based knowledge examination at a test center, primarily multiple choice and multiple select; picture-click questions may also occur. The optional hands-on performance examination is separate.
How many questions are on the exam?
Total questions: 165.
How long is the exam?
365-minute listed session including the scheduled 30-minute break, leaving 335 minutes to answer questions. A separate 10-minute introductory tutorial extends the appointment; unused tutorial time does not extend answering time.
What is the passing score?
500 on the 0–700 scaled-score scale; scores at or above 500 are reported as Pass.
How much does the exam cost?
US program Standard Model/CBT Level II application fee: $325, effective August 1, 2026. Do not add state or local taxes; fees are subject to change. Rescheduling charges may apply under the published conditions.
Official sources and references
- NICET Asphalt examination program
Content Outlines / current Level II link
- NICET Asphalt Level II Content Outline
PDF pages 1-2 / Level II outline
- NICET Asphalt examination program
What to Expect / delivery
- NICET examination policy
Number of Questions and Time Allowed
- NICET scoring policy
Scaled Score
- NICET Asphalt examination program
Level II timing row
- NICET Asphalt examination program
Test Time / break footnote
- NICET Asphalt examination program
Test Time / tutorial
- NICET fee schedule
Standard Model/CBT Application / Level II
- NICET fee schedule
Effective fee date
Confirm current exam arrangements with the exam provider.