1What is the slope of the line through (2, 9) and (8, -3)?
- A. Negative two
- B. Negative one-half
- C. Positive one-half
- D. Positive two
2Under the NSPE Code, an engineer's safety judgment is overruled in circumstances endangering life. What response is required?
- A. Notify the employer or client and other appropriate authority
- B. Document the objection privately and proceed without notification
- C. Notify the client only after an injury establishes the danger
- D. Defer notification while the client accepts financial responsibility
Answer: A
Explanation: NSPE requires that engineers "shall notify their employer or client and such other authority as may be appropriate." The rule applies when their judgment is overruled under circumstances endangering life or property; private documentation, waiting for harm, and shifting financial risk do not satisfy it.
Reference: NSPE Code of Ethics for Engineers — Rules of Practice, public safety canon, paragraph beginning If engineers' judgment is overruled
3A uniform net pressure of 2 kPa acts normally on one face of a 3 m by 2 m flat panel. What is the magnitude of its resultant force?
- A. 6 kN
- B. 10 kN
- C. 12 kN
- D. 24 kN
Answer: C
Explanation: NASA states, "Integrating the pressure times the surface area around the body determines the aerodynamic force on the object." For a flat panel under uniform net pressure, R = pA = 2(3)(2) = 12 kN. The alternatives confuse one dimension, perimeter, or an extra face with loaded area.
Reference: NASA Glenn: Generalized Center of Pressure — Center of Pressure, first paragraph
4A particle moves along a straight line with initial velocity 4 m/s and constant acceleration 3 m/s² in the same direction. What is its velocity after 2 s?
- A. 6 m/s
- B. 7 m/s
- C. 8 m/s
- D. 10 m/s
Answer: D
Explanation: DOE states, "The acceleration equals the rate of change of velocity with respect to time." With constant acceleration, the change in velocity is aΔt = 6 m/s, so v = 4 + 6 = 10 m/s. The other choices omit or misapply the initial velocity or time.
Reference: DOE Fundamentals Handbook: Mathematics, Volume 2 — MA-05, Calculus, p. 34, example 4
5A concrete batch contains 160 kg of total mixing water, 300 kg of cement, and 100 kg of fly ash. What is its water-to-cementitious-materials mass ratio?
- A. 0.30
- B. 0.40
- C. 0.53
- D. 1.60
Answer: B
Explanation: FHWA defines the ratio using water "divided by the combined mass of the cement and any additional cementitious materials". Thus w/cm = 160/(300 + 100) = 0.40. Ignoring fly ash gives 0.53; the other values use the wrong numerator or denominator.
Reference: FHWA HIPERPAV II: Chapter 5, Input Parameters — §5.2.2, Cement Type and Content
6A flow is collected in a calibrated tank. It takes 40 s to collect 0.80 m³. What is the average volumetric flow rate?
- A. 0.020 m³/s
- B. 0.032 m³/s
- C. 0.050 m³/s
- D. 0.200 m³/s
Answer: A
Explanation: USBR states, "Discharge or rate of flow has units of volume divided by unit time." Thus Q = 0.80/40 = 0.020 m³/s. The other values use an incorrect time or volume conversion.
Reference: USBR Water Measurement Manual: Basic Principles of Water Measurement — Basic Principles of Water Measurement, paragraph beginning Discharge or rate of flow
7A watershed's soil is already saturated when another storm begins. Compared with the same soil when dry, what hydrologic response is generally expected under otherwise comparable rainfall?
- A. Less additional infiltration and more surface runoff
- B. More additional infiltration and less surface runoff
- C. Less additional infiltration and less surface runoff
- D. More additional infiltration and more groundwater storage capacity
Answer: A
Explanation: USGS states that "soil already saturated from previous rainfall can't absorb much more". Limited additional soil-water storage promotes surface runoff; the alternatives reverse that relationship or assume increased storage capacity in already saturated soil.
Reference: USGS Water Science School: Infiltration and the Water Cycle — Factors affecting infiltration, Soil saturation
8A vertical column carries a 40-kN downward roof load and a 60-kN downward floor load below the roof. Neglect column weight. What axial force acts in the column segment below both loads?
- A. 20 kN in compression
- B. 60 kN in compression
- C. 100 kN in compression
- D. 100 kN in tension
9What is the role of designated design speed in roadway geometric design?
- A. It specifies the observed average speed during every hour.
- B. It provides a selected basis for geometric features such as curve radius.
- C. It establishes the legal speed limit without a separate determination.
- D. It specifies the maximum speed physically attainable by a vehicle.
Answer: B
Explanation: FHWA states, "The designated design speed is used explicitly for determining minimum values for highway design such as horizontal curve radius and sight distance." It is a design input, distinct from measured operating speed, a legal limit, or a physical maximum.
Reference: FHWA Speed Concepts Informational Guide: Engineering and Technical Concepts — Chapter 4, Design Speed
10On a federal construction project, design and construction are combined in one contract with one contractor. Which project delivery method does FAR 36.102 identify?
- A. Design-bid-build
- B. Separate prime contracting
- C. Construction management as adviser
- D. Design-build
Answer: D
Explanation: FAR states, "Design-build means combining design and construction in a single contract with one contractor." The decisive condition is the combined design-and-construction contractual responsibility.
Reference: Federal Acquisition Regulation 36.102: Definitions — 36.102, Design-build definition
Topics in this practice bank
These topics describe the available practice for FE Civil. Review the examination outline and its sources for scope and allocation details.
Mathematics and Statistics
- Analytic geometry
- Single-variable calculus
- Vector operations
- Statistics
Ethics and Professional Practice
- Codes of ethics
- Professional liability
- Licensure
- Contracts and contract law
Engineering Economics
- Time value of money
- Cost
- Analyses
- Uncertainty
Statics
- Resultants of force systems
- Equivalent force systems
- Equilibrium of rigid bodies
- Frames and trusses
- Centroid of area
- Area moments of inertia
- Static friction
Dynamics
- Kinematics
- Mass moments of inertia
- Force acceleration
- Work, energy, and power
Mechanics of Materials
- Shear and moment diagrams
- Stresses and strains
- Deformations
- Combined stresses, principal stresses, and Mohr's circle
Materials
- Mix design of concrete and asphalt
- Test methods and specifications
- Physical and mechanical properties
Fluid Mechanics
- Flow measurement
- Fluid properties
- Fluid statics
- Energy, impulse, and momentum of fluids
Surveying
- Angles, distances, and trigonometry
- Area computations
- Earthwork and volume computations
- Coordinate systems
- Leveling
Water Resources and Environmental Engineering
- Basic hydrology
- Basic hydraulics
- Pumps
- Water distribution systems
- Flood control
- Stormwater
- Collection systems
- Groundwater
- Water quality
- Testing and standards
- Water and wastewater treatment
Structural Engineering
- Analysis of statically determinant structures
- Deflection of statically determinant structures
- Column analysis
- Structural determinacy and stability analysis
- Elementary statically indeterminate structures
- Loads, load combinations, and load paths
- Design of steel components
- Design of reinforced concrete components
Geotechnical Engineering
- Index properties and soil classifications
- Phase relations
- Laboratory and field tests
- Effective stress
- Stability of retaining structures
- Shear strength
- Bearing capacity
- Foundation types
- Consolidation and differential settlement
- Slope stability
- Soil stabilization
Transportation Engineering
- Geometric design
- Pavement system design
- Traffic capacity and flow theory
- Traffic control devices
- Transportation planning
Construction Engineering
- Project administration
- Construction operations and methods
- Project controls
- Construction estimating
- Interpretation of engineering drawings
How to use these free practice questions
Choose an answer, check the explanation, and review your progress by chapter. Practice questions and explanations are free to access without signing up.
These are independent study questions, not actual examination items. For examination requirements and official information, view FE Civil details.