Sample Practice Questions
Try these 10 sample questions from the HPE Network Data Center Professional Exam practice bank. Each includes the answer and explanation. Continue with the interactive practice above to review the full question set.
1In the HPE Aruba Networking spine-and-leaf reference design, what change increases east-west fabric capacity between existing leaf switches?
- A.Add spine switches to the fabricCorrect answer: A
- B.Add server access switches to the fabric
- C.Add VLANs to existing leaf switches
- D.Add VRFs to existing spine switches
Explanation: "Spine switches are added to increase east-west fabric capacity between leaf switches." Additional spines increase interleaf fabric capacity; the other changes do not provide additional spine fabric capacity.
Reference: HPE Aruba Networking Validated Solution Guide: Data Center Design — Underlay Network Design, page 14
2During staging, a CX 10000 is to receive its initial configuration automatically using ZTP. What state must the switch be in?
- A.A configuration with ZTP manually completed
- B.Factory default configurationCorrect answer: B
- C.A previously saved production configuration
- D.A running configuration copied from another switch
3An administrator configures a static IPv4 VXLAN on AOS-CX 10.13. Which command sets the remote VTEP address inside the VNI?
- A.no shutdown
- B.vtep-peerCorrect answer: B
- C.source ip
- D.vlan
4A CX 10000 port LED flashes after initialization. Which two sources does the installation guide direct an engineer to check for the fault condition?
- A.The switch event log and show interface outputCorrect answer: A
- B.The show spanning-tree and show lacp interfaces output
- C.The show environment fan and show spanning-tree output
- D.The show lacp interfaces and show environment fan output
Explanation: "Check the switch Event Log and show interface command output for indication of the fault condition." The event log and interface output help identify the port fault.
Reference: HPE Aruba Networking CX 10000 Distributed Services Switch Installation and Getting Started Guide — Diagnostic Tips, tip 6, page 42
5A network operator needs to see installed NAE agents and their individual status in the AOS-CX 10.13 Web UI. Where is that list shown?
- A.The Scripts panel of the Analytics Dashboard
- B.A single agent's time-series graph
- C.The Agents panel of the Analytics DashboardCorrect answer: C
- D.A single agent's Status panel
Explanation: "The Agents panel in the Analytics Dashboard shows a list of the agents installed on the switch, along with the status of each agent." The dashboard's Agents panel lists installed agents and their status.
Reference: AOS-CX 10.13 Network Analytics Engine Guide — Viewing a list of agents installed on a switch using the Web UI, page 34
6An engineer tracks AOS-CX releases against the Fabric Composer 6.6 compatibility matrix. What does the matrix's Qualified label mean?
- A.The AOS-CX version is fully testedCorrect answer: A
- B.The AOS-CX version is no longer supported
- C.The AOS-CX version has not yet been tested
- D.The AOS-CX version is scheduled for mandatory removal
7A data center uses storage traffic and ordinary lossy traffic on the same Ethernet link. Which DCB mechanism reserves bandwidth for the traffic classes?
- A.Data Center Bridging Exchange
- B.Explicit Congestion Notification
- C.Enhanced Transmission SelectionCorrect answer: C
- D.Priority-based Flow Control
Explanation: "ETS: Enhanced Transmission Selection Defines bandwidth reservations for traffic classes so that lossless and lossy traffic can coexist on the same link." ETS supplies reservations, PFC controls pauses, DCBx exchanges settings, and ECN signals congestion.
Reference: HPE Aruba Networking Validated Solution Guide: Data Center Design — Building Reliable Ethernet, page 63
8A fabric leaf must originate and terminate VXLAN tunnels to remote peers. Which function supplies those overlay tunnel endpoints?
- A.The underlay OSPF area
- B.The VXLAN tunnel endpointCorrect answer: B
- C.The EVPN route distinguisher
- D.The BGP route reflector
Explanation: "A VXLAN Tunnel End Point (VTEP) is the function within leaf switches that handles the origination and termination of point-to-point tunnels forming an overlay network." The VTEP terminates the data-plane tunnels; the other choices concern routing or identification.
Reference: HPE Aruba Networking Validated Solution Guide: Data Center Design — Overlay Data Plane Network, page 16
9A CX 10000 is staged for ZTP using a wired network connection. Which switch port should be connected to the appropriate network?
- A.USB-A auxiliary port
- B.A QSFP28 data port
- C.RJ-45 out-of-band management portCorrect answer: C
- D.RJ-45 serial console port
Explanation: "Connect the switch to the network using the RJ-45 out-of-band management port and power on the switch (or power off, then power on the switch)." The documented ZTP procedure uses the out-of-band management port.
Reference: HPE Aruba Networking CX 10000 Distributed Services Switch Installation and Getting Started Guide — Setup for Initial Configuration, page 32
10An AOS-CX 10.13 design calls for a single L2 VNI to map an existing VLAN. What constraint applies when configuring that mapping?
- A.The VNI must have an EVPN-enabled default VRF
- B.The VNI must have two VLANs mapped to it
- C.The VNI must have symmetric routing disabledCorrect answer: C
- D.The VNI must have symmetric routing enabled
Exam Review
About HPE Network Data Center Professional Exam
HPE Network Data Center Professional Exam · US
Key exam facts
- Provider
- Pearson VUE
- Format
- Proctored written examination; Pearson testing center or OnVUE online proctoring; no reference material allowed.
- Exam questions
- Total questions: 75.
- Time limit
- 2 hours
- Passing score
- 65%
Topics covered
Plan the low-level design (14%)
- Create a low-level design from a high-level design for HPE Aruba Networking data center switches
- Create or validate the BoM from the low-level design
- Evaluate physical environment and data center infrastructure; recommend necessary changes
Install the solution (13%)
- Stage network equipment for testing before final installation
- Execute physical installation of equipment
- Validate the installation
Configure the solution (23%)
- Implement the low-level design using various interface mechanisms
- Verify that configuration meets design requirements
- Configure monitoring tools
Troubleshoot (15%)
- Diagnose issues with embedded diagnostic tools
- Determine issue severity and plan remediation
- Resolve issues using appropriate tools
Create a monitored environment (12%)
- Monitor performance, availability and system resources using monitoring and reporting tools
- Establish baselines and define alert thresholds
- Generate reports of switch and data center health
Maintain and optimize (12%)
- Monitor HPE and third-party release cycles
- Maintain licenses and subscriptions
- Optimize traffic
- Optimize security
- Optimize automation
Integration (11%)
- Implement switch features integrating and interoperating with server, storage, workload and applications
How to prepare
Work through the topics, read the explanation after each answer, and revisit the areas where you miss questions. Use the official outline and reference materials below to guide your study.
These independent practice questions are not actual exam items and do not guarantee a passing result.
Frequently asked questions
What is the exam format?
Proctored written examination; Pearson testing center or OnVUE online proctoring; no reference material allowed.
How many questions are on the exam?
Total questions: 75.
How long is the exam?
2 hours
What is the passing score?
65%
Official sources and references
- HPE7-A05 Exam Preparation Guide
page 1, Objectives adoption statement
- HPE7-A05 Exam Preparation Guide
page 2, complete Percentage of Exam / Sections/Objectives table, sections 1-7 and objectives 1.1-7.1
- HPE7-A05 Exam Preparation Guide
page 1, Advice to help you take this exam, knowledge-source limitation
- HPE7-A05 current examination card
Summary
- HPE7-A05 Exam Preparation Guide
page 1, testing-site and beta-item notice
- HPE examination policies
Exam retake policy, HPE0/HPE6/HPE7
- HPE exam preparation and results
Registration and results / Before you begin, score policy
- HPE exam preparation and results
Registration and results, concluding results paragraph
- HPE7-A05 current examination card
Examination introduction, registration guidance
- Pearson VUE HPE testing program
HPE Certification and Learning / account migration
- Pearson VUE HPE testing program
OnVUE online proctored exams available
- Pearson VUE HPE testing program
Exam types - Proctored / HPE0, HPE6, and HPE7 exams
- HPE credential management platform
HPE credential management platform / learner ID note
- HPE credential management platform
Scheduling and taking an exam / Schedule your exam
- HPE examination policies
Candidate agreement
- HPE exam preparation
Registration and results / Before you begin, identification
- HPE7-A05 examination details
Details / Ideal candidate
Confirm current exam arrangements with the exam provider.