OpenExamsFREE PRACTICE — ANY EXAM

Free New Hampshire Water Well Board Water Well Contractor Examination — Drilled Wells Practice Questions

100 free questions · Answer explanations · No signup required

View examination details, outline and sources

Loading selected examination banks…

Sample Practice Questions

Try these 10 sample questions from the New Hampshire Water Well Board Water Well Contractor Examination — Drilled Wells practice bank. Each includes the answer and explanation. Continue with the interactive practice above to review the full question set.

  1. 1A contractor is siting a new private drinking-water well in New Hampshire. What area must be maintained around the well?

    1. A. A protective well radius
    2. B. An effluent disposal area
    3. C. A state highway right-of-way
    4. D. A recorded property easement

    Answer: A

    Explanation: We 602.06(b) states, "a protective area designated as the protective well radius shall be maintained around every private commercial or non-commercial drinking water well." Therefore the required area is the protective well radius.

    Reference: We 100-800 — We 602.06(b)

  2. 2Site conditions prevent full setbacks. What quality must guide selection of the alternate well location?

    1. A. It places the well at the parcel center
    2. B. It minimizes the length of the access road
    3. C. It is closest to the building foundation
    4. D. It maximizes setback distances to the greatest extent possible

    Answer: D

    Explanation: We 602.13(a) requires the contractor to identify an alternate location that "maximizes setback distances to the greatest extent possible." That criterion controls the selection.

    Reference: We 100-800 — We 602.13(a)

  3. 3During bedrock drilling, which fracture-related occurrence must be observed and recorded?

    1. A. Depth to static water before pump installation
    2. B. Depths to fractures yielding readily observable water
    3. C. Depth to bedrock below unconsolidated material
    4. D. Total depth of the completed well

    Answer: B

    Explanation: We 602.20(b)(3) requires recording the "Depths to fractures yielding readily observable amounts of water." This is a direct drilling observation.

    Reference: We 100-800 — We 602.20(b)(3)

  4. 4During construction of a drilled gravel well, what formation information must be recorded?

    1. A. Treatment chemical dosages
    2. B. Only the final pump model
    3. C. Only the owner's water bill
    4. D. Material types and layer thicknesses

    Answer: D

    Explanation: We 602.23(c)(1) requires recording the "Types of materials encountered during construction and the thickness of the layers." Those observations describe the formation.

    Reference: We 100-800 — We 602.23(c)(1)

  5. 5During construction, when must well yield be measured before the final test?

    1. A. Whenever a readily observable change in yield occurs
    2. B. At fixed ten-foot drilling intervals only
    3. C. Only when casing is delivered
    4. D. Only after the completion report is filed

    Answer: A

    Explanation: We 602.33(a) states, "Well yield shall be measured periodically during well construction when there is a readily observable change in yield." Observable yield changes trigger measurement.

    Reference: We 100-800 — We 602.33(a)

  6. 6When may a well casing be terminated below grade under We 602.35?

    1. A. Whenever the well is more than 100 feet from a house
    2. B. Whenever the owner prefers a hidden wellhead
    3. C. When an above-grade termination would pose a hazard
    4. D. Only when the casing is plastic

    Answer: C

    Explanation: We 602.35(a)(1) requires that "The location of the well would pose a hazard if the casing extended above the ground surface." Owner preference alone is not the stated condition.

    Reference: We 100-800 — We 602.35(a)

  7. 7Who may seal a well in New Hampshire?

    1. A. A water well contractor licensed in New Hampshire
    2. B. Any property owner with excavation equipment
    3. C. Any licensed electrician
    4. D. Only a pump manufacturer

    Answer: A

    Explanation: We 604.02(b) states, "A well shall be sealed only by a licensed New Hampshire water well contractor" holding a valid license under RSA 482-B. The work is restricted to that license class.

    Reference: We 100-800 — We 604.02(b)

  8. 8Which location information is required on a New Hampshire well completion report?

    1. A. Geographic coordinates only
    2. B. Geographic coordinates, available emergency-service address, and tax map and lot number
    3. C. Emergency-service address and tax map and lot number, but no coordinates
    4. D. Geographic coordinates and emergency-service address, but no tax map and lot number

    Answer: B

    Explanation: We 801.01(a)(3) requires location by "Geographic coordinates provided by global positioning technology," the available enhanced 911 address, and the tax map and lot number.

    Reference: We 100-800 — We 801.01(a)(3)

  9. 9A proposed protective well radius fits entirely within the parcel. Which placement satisfies the listed containment options?

    1. A. Wholly in a public-road surface
    2. B. Wholly on-lot
    3. C. Wholly in an unrecorded neighboring yard
    4. D. Wholly in a future building footprint

    Answer: B

    Explanation: We 602.08(b)(1) expressly permits the radius to be contained "Wholly on-lot." The other choices do not match the rule's listed containment methods.

    Reference: We 100-800 — We 602.08(b)(1)

  10. 10Before constructing at a reduced-setback location, what risk must the contractor communicate to the property owner?

    1. A. The possibility of higher annual license fees
    2. B. The potential for contamination at the alternate location
    3. C. The chance that the board will change exam dates
    4. D. The likelihood of a property-tax reassessment

    Answer: B

    Explanation: We 602.13(b) directs the contractor to "Alert the property owner of the potential for contamination at the proposed alternate location." The notice concerns contamination risk.

    Reference: We 100-800 — We 602.13(b)

Topics in this practice bank

These topics describe the available practice for New Hampshire Water Well Board Water Well Contractor Examination — Drilled Wells. Review the examination outline and its sources for scope and allocation details.

  • Well Siting and Protective Areas
    • Protective well radii and property boundaries
    • Septic-system setbacks and approved plans
    • Setbacks from other contamination sources
  • Reduced Setbacks
    • Eligibility and owner notification
    • Special construction methods and documentation
  • Drilled Bedrock Well Construction
    • Bedrock observations, casing functions and materials
    • Bedrock casing installation and seals
    • Grouting and flowing-artesian discharge protection
  • Drilled Wells in Unconsolidated Materials
    • Formation records and casing materials
    • Casing placement, termination and completion
  • Well Development and Disinfection
    • Yield development and measurement
    • Hydrofracturing controls
    • Chlorination and discharge
  • Wellhead Completion and Maintenance
    • Below-grade casing termination
    • Active and inactive well maintenance and casing extensions
  • Well Abandonment
    • Abandonment determination and responsibility
    • Preparation and sealing methods
  • Well Completion Reporting
    • Required report content and location data
    • Submission timing, methods and late reports

How to use these free practice questions

Choose an answer, check the explanation, and review your progress by chapter. Practice questions and explanations are free to access without signing up.

These are independent study questions, not actual examination items. For examination requirements and official information, view New Hampshire Water Well Board Water Well Contractor Examination — Drilled Wells details.