1An Indiana driller is choosing among feasible locations for a new domestic well. How should the site relate to a known contamination source?
- A. As far away as practicable
- B. At least 25 feet away
- C. At least 50 feet away
- D. At least 100 feet away
Answer: A
Explanation: 312 IAC 13-3-2(a)(2) requires a well to be located "As far as practicable" from any known contamination source. The rule does not substitute a universal numeric setback here.
Reference: Title 312, ARTICLE 13. WATER WELL DRILLERS AND WATER WELL PUMP INSTALLERS | IARP — 312 IAC 13-3-2(a)(2)
2Who is responsible under Indiana rules for initiating, maintaining, and supervising operations at a drilling site?
- A. The property owner
- B. The licensed driller or pump installer
- C. The local health officer
- D. The equipment manufacturer
3During driven-casing installation, where must the casing sit within the larger starter borehole?
- A. Against the upgradient wall
- B. Against the downgradient wall
- C. Centered in the borehole
- D. Offset toward the discharge line
4A larger temporary casing is used to install a smaller permanent casing. What follow-up construction step is generally required?
- A. Pressure-test the temporary casing
- B. Grout the well under the rotary-or-auger standard
- C. Install a second well screen
- D. Leave the temporary casing as an annular liner
5Which flow path is provided by a pitless adapter under the Indiana definition?
- A. Water through the casing wall
- B. Air through the well vent
- C. Grout upward through the annulus
- D. Drilling fluid up the drill stem
Answer: A
Explanation: 312 IAC 13-1-19.5 defines a pitless adapter as an assembly that "allows water to pass through the wall of the well casing." The alternatives are real well-system flow paths but are performed by other components or operations.
Reference: Title 312, ARTICLE 13. WATER WELL DRILLERS AND WATER WELL PUMP INSTALLERS | IARP — 312 IAC 13-1-19.5(1)
6Under Indiana's rule definition, what is the regulatory purpose of well disinfection?
- A. Destroy pathogenic microorganisms
- B. Increase aquifer transmissivity
- C. Raise static water level
- D. Enlarge screen openings
7Under Indiana's statutory definition, which description correctly identifies groundwater?
- A. Water beneath the ground surface regardless of location or form
- B. Only water in mapped sand-and-gravel aquifers
- C. Only water below consolidated bedrock
- D. Water stored in a finished well casing
8What behavior identifies groundwater in a confined aquifer?
- A. It rises above the upper aquifer boundary because of hydrostatic head
- B. It remains fixed at the aquifer bottom
- C. It flows only when the casing is pressurized
- D. It evaporates before entering a well
9A cable-tool crew will drive casing directly. What starter-borehole depth range does Indiana prescribe?
- A. 1 to 3 feet
- B. 2 to 4 feet
- C. 3 to 5 feet
- D. 5 to 8 feet
10A DNR representative arrives while a crew is drilling. Which equipment-related authority may the representative exercise?
- A. Select the drilling contractor
- B. Inspect equipment used to drill the well
- C. Set the contract price
- D. Choose the production aquifer
Topics in this practice bank
These topics describe the available practice for Indiana Water Well Driller Competency Examination. Review the examination outline and its sources for scope and allocation details.
- Placement of wells
- Well drilling procedures
- Operations of well drilling and water well pump equipment
- Contamination precautions
- Installation of well casing and water well pumps
- Well grouting procedures
- Well screen design and installation
- Pitless adapter units
- Installation of pumping apparatus
- Well disinfection
- Sealing abandoned wells
- Ground water occurrence
- Aquifer characteristics
- Drawdown requirements and limitations
- Depth considerations
- Methods of measuring well yield
- The requirements of this chapter and other laws relating to wells
- Other accepted standards relating to the drilling, operation, and abandonment of wells and water well pumps
How to use these free practice questions
Choose an answer, check the explanation, and review your progress by chapter. Practice questions and explanations are free to access without signing up.
These are independent study questions, not actual examination items. For examination requirements and official information, view Indiana Water Well Driller Competency Examination details.