Free North Dakota Water Well Contractor Examination Practice Questions
100 free questions · Answer explanations · No signup required
View examination details, outline and sourcesLoading selected examination banks…
Sample Practice Questions
Try these 10 sample questions from the North Dakota Water Well Contractor Examination practice bank. Each includes the answer and explanation. Continue with the interactive practice above to review the full question set.
1A company plans to construct a water well for a paying customer in North Dakota. Who must be in charge of the work?
- A. A certified monitoring well contractor
- B. A certified water well contractor
- C. A registered pump manufacturer
- D. A licensed geothermal system driller
Answer: B
Explanation: NDCC 61-03-27(1) states that a firm may not construct a water well unless "a certified water well contractor, who is responsible for the proper construction or alteration of a water well, is in charge." The water-well credential, not one of the separately regulated specialties, controls this job.
Reference: North Dakota Century Code t61c03 — NDCC 61-03-27(1)
2Under North Dakota's construction rule, when does a supply qualify as a public water supply based on service connections?
- A. At least 10 connections
- B. At least 12 connections
- C. At least 15 connections
- D. At least 25 connections
3Absent department approval for another design, from at least what depth must the standard annular seal extend to the ground surface?
4What standard applies to wrought-iron or steel well casing through 10 inches in diameter in North Dakota?
- A. Schedule 20 or equivalent
- B. Schedule 30 or equivalent
- C. Schedule 40 or equivalent
- D. Schedule 80 only
5What fundamental criterion governs selection of water used in the drilling process?
- A. It must come from a source that will not contaminate the well
- B. It must match the anticipated aquifer temperature
- C. It must have greater mineralization than the formation water
- D. It must be selected solely for hauling convenience
Answer: A
Explanation: NDAC 33.1-18-01-06(1) requires: "Water used in the drilling process shall be obtained from a source which will not result in contamination of the well." Temperature, mineralization, or convenience does not replace that controlling criterion.
6When must a newly constructed well be tested for plumbness and alignment?
- A. Before drilling starts
- B. After the first annual renewal
- C. Upon completion of construction
- D. Only after pump failure
7Which openings are covered by North Dakota's abandoned-water-well sealing requirement?
- A. Only wells that once supplied a public system
- B. Test wells, uncompleted wells, and completed wells
- C. Only wells deeper than 100 feet
- D. Only flowing wells with damaged valves
8During well-performance measurements, which reading represents the static water level?
- A. The water level while the well pumps at full rate
- B. The water level immediately after adding grout
- C. The level at which water stands when none is being discharged
- D. The difference between well yield and drawdown
9A North Dakota landowner wants to construct a water well on the landowner's own premises solely for personal use. How does the contractor-certification requirement apply?
- A. The owner-use construction is expressly excepted
- B. The owner must obtain a monitoring-well credential
- C. The owner must employ a pump-and-pitless installer
- D. The owner must obtain a temporary water-well license
Answer: A
Explanation: NDCC 61-03-27(1) provides: "This section does not prohibit any person, partnership, association, corporation, or limited liability company from constructing any water well on the person's or entity's own premises for the person's or entity's own use." The stated facts fit that exception.
Reference: North Dakota Century Code t61c03 — NDCC 61-03-27(1)
10A well serves no more than fourteen connections. Which use pattern independently makes it a public water supply under the North Dakota rule?
- A. An average of 20 persons for 90 days per year
- B. An average of 25 persons daily for 60 days per year
- C. An average of 50 persons for 30 days per year
- D. An average of 60 persons for 25 days per year
Topics in this practice bank
These topics describe the available practice for North Dakota Water Well Contractor Examination. Review the examination outline and its sources for scope and allocation details.
Licensure, Supervision, and Reporting
- Water well contractor licensure scope and qualifications
- Responsible supervision and equipment identification
- Completion reporting and post-examination licensure duties
Definitions, Planning, and Well Location
- Water well construction and water-supply definitions
- Public-well plans, specifications, and approvals
- Contamination setbacks, access, and site constraints
Groundwater Protection and Special Well Types
- Protective annular seals and grouting depths
- Radial collector, dug, bored, and infiltration wells
- Flowing-well construction and groundwater protection
Casing, Screens, and Filter Packs
- Ferrous casing dimensions, joints, and drive protection
- Thermoplastic and other nonferrous casing
- Packers, screens, and filter-pack materials
Construction Water, Development, Testing, and Grouting
- Construction water and drilling-fluid controls
- Well development and yield/drawdown testing
- Grout formulations, guides, and placement
Completion Records, Wellhead Protection, and Water Quality
- Construction records, plumbness, terminals, and temporary caps
- Cleaning, disinfection, sampling, and service readiness
Abandonment and Artesian-Well Control
- Abandonment objectives, prohibitions, and materials
- Sealing methods for geologic and flowing conditions
Water-Level Measurement and Well Performance
- Static level, pumping level, drawdown, and specific capacity
- Performance trends and well-problem diagnosis
How to use these free practice questions
Choose an answer, check the explanation, and review your progress by chapter. Practice questions and explanations are free to access without signing up.
These are independent study questions, not actual examination items. For examination requirements and official information, view North Dakota Water Well Contractor Examination details.