Free Certified Six Sigma Yellow Belt Practice Questions
200 free questions · Answer explanations · No signup required
View examination details, outline and sourcesLoading selected examination banks…
Sample Practice Questions
Try these 10 sample questions from the Certified Six Sigma Yellow Belt practice bank. Each includes the answer and explanation. Continue with the interactive practice above to review the full question set.
1What is the central process-improvement aim of Six Sigma?
- A. Increase the amount of final inspection
- B. Reduce variation that contributes to defects
- C. Increase the range of acceptable customer needs
- D. Reduce the frequency of measuring performance
2What does the voice of the customer communicate to a process-improvement team?
- A. The supplier's preferred production schedule
- B. The team's preferred technical solution
- C. The process owner's annual operating budget
- D. Customers' requirements and expectations
3Five observed completion times are 4, 6, 7, 8, and 10 minutes. What is their arithmetic mean?
4A workplace contains obsolete tools mixed with tools still needed for daily work. Which 5S step separates needed from unneeded items?
5Which pattern of process improvement is associated with the kaizen approach?
- A. Making a single large redesign across the entire organization
- B. Waiting for a breakthrough to replace the existing process
- C. Making continuing small, incremental process improvements
- D. Restoring prior operating performance after each breakdown
Answer: C
Explanation: The handbook describes kaizen as improving processes through "small, incremental steps." It supports continuing improvement rather than postponing all change until a large redesign.
Reference: The ASQ Certified Six Sigma Yellow Belt Handbook, Second Edition — Chapter 2, p. 21, Kaizen versus Kaizen Event
6Which DMAIC phase establishes the problem and the goals of an improvement project?
7A customer requests a particular product feature. Why should a team ask what benefit the customer seeks from that feature?
- A. To avoid documenting the original feedback
- B. To identify the underlying need that different solutions could satisfy
- C. To replace customer priorities with technical preferences
- D. To treat the requested feature as the only acceptable design
8What is the median of the observations 9, 3, 12, 5, and 7?
9After removing unnecessary items, workers give each frequently used tool a labeled, easily reached location. Which 5S step is illustrated?
10What distinguishes a kaizen blitz from a typical long-duration improvement project?
- A. Concentrated short-duration work implementing a focused change
- B. Part-time project work distributed across several monthly phases
- C. Extended design followed by a single organization-wide conversion
- D. Recurring planning meetings that hand implementation to later projects
Topics in this practice bank
These topics describe the available practice for Certified Six Sigma Yellow Belt. Review the examination outline and its sources for scope and allocation details.
Six Sigma Fundamentals
- Six Sigma Foundations and Principles
- Lean Foundations and Principles
- Six Sigma Roles and Responsibilities
- Team Basics
- Quality Tools and Six Sigma Metrics
Define Phase
- Project Identification
- Project Management (PM) Basics
Measure Phase
- Basic Statistics
- Data Collection
- Measurement System Analysis (MSA)
Analyze Phase
- Process analysis tools
- Root cause analysis
- Corrective action
- Preventive action
- Data analysis
- Correlation and regression
- Hypothesis testing
Improve and Control Phases
- Improvement techniques
- Control Tools and Documentation
How to use these free practice questions
Choose an answer, check the explanation, and review your progress by chapter. Practice questions and explanations are free to access without signing up.
These are independent study questions, not actual examination items. For examination requirements and official information, view Certified Six Sigma Yellow Belt details.