Free California Branch 1 Field Representative Written Examination Practice Questions
100 free questions · Answer explanations · No signup required
View examination details, outline and sourcesLoading selected examination banks…
Sample Practice Questions
Try these 10 sample questions from the California Branch 1 Field Representative Written Examination practice bank. Each includes the answer and explanation. Continue with the interactive practice above to review the full question set.
1A California fumigation is ready for gas release. Who must possess the properly signed Occupant Fumigation Notice or a written or electronic copy at the fumigation site?
- A.The licensed fumigatorCorrect answer: A
- B.The company dispatcher
- C.The property manager
- D.The equipment supplier
Explanation: California Structural Pest Control Act and Regulations states:"The properly signed form or a copy, written or electronic, thereof must be in the possession of the licensed fumigator, at the fumigation site, when the fumigant is released." An electronic copy is permitted, but the licensed fumigator must possess it at the fumigation site when gas is released.
Reference: California Structural Pest Control Act and Regulations — 16 CCR §1970.4(a)
2Before a California structural fumigation, a field representative confirms that natural gas service is off. At what point does DPR's inspection guidance require the service to be off?
- A.At the furnace's fan controller
- B.At each appliance's thermostat
- C.At the room's appliance switch
- D.At the main service valveCorrect answer: D
Explanation: DPR Structural Fumigation Use Monitoring Inspection Procedures states:"Verify there is no source of heat or spark in the structure, and the natural gas service is off at the main service valve." Turning off appliance controls does not establish shutoff at the main service valve.
Reference: DPR Structural Fumigation Use Monitoring Inspection Procedures — Chapter 7, requirement 6—Labeling Available/Labeling Compliance
3A California fumigator verifies that the required fumigant concentration was retained during exposure. At what stage must the concentration-retention test described in BPC §8505.8 be taken?
- A.After the tarps are removed from the treated enclosure
- B.After the initial fan-assisted ventilation period ends
- C.Before ventilation of the treated enclosure beginsCorrect answer: C
- D.After the central-air ducts are ventilated and tested
Explanation: California Structural Pest Control Act and Regulations states:"8505.8. Prior to the commencement of fumigation, the space to be fumigated shall be sealed in such manner that tests taken before ventilation is begun will show that the required concentration of the fumigant released within the space has been retained therein, in compliance with the manufacturer’s recommendations." The statute calls for tests taken before ventilation, when they can show retention during exposure rather than dilution after opening.
Reference: California Structural Pest Control Act and Regulations — BPC §8505.8
4A CAP job began at 24 ounces of sulfuryl fluoride per 1,000 cubic feet. The high ambient temperature during aeration is above 40°F. What is the minimum active aeration time in CAP Table 2?
- A.12 hours
- B.16 hours
- C.14 hoursCorrect answer: C
- D.18 hours
Explanation: California Aeration Plan for Structural Fumigations states:"TABLE 2 Determining Minimum Aeration Time Determining Minimum Aeration Time Initial Concentration of Sulfuryl Fluoride Introduced (ounces per thousand cubic feet) 16 or less 17 to 32 33 to 48 49 to 64 65 to 96 97 to 112 > 112 Minimum Aeration Time (hours)** 12 14 16 18 20 22 24 " 24 oz/1,000 ft³ falls in the 17–32 range, corresponding to 14 hours. Adjacent table rows do not control this dose.
Reference: California Aeration Plan for Structural Fumigations — p.333—Table2, Determining Minimum Aeration Time
5Before a handler first uses a required respirator, whose report does DPR N-5 require to determine whether that person can wear it safely?
- A.The equipment supplier's report
- B.The evaluating doctor's reportCorrect answer: B
- C.The fit-test technician's report
- D.The pesticide trainer's report
Explanation: DPR Pesticide Safety Information Series N states:"The doctor must give a report to your employer (and give you a copy) about whether or not you can wear a respirator safely before you use one." A doctor's evaluation determines medical fitness before use. A fit test checks seal and fit, while equipment and safety training address other parts of the program.
Reference: DPR Pesticide Safety Information Series N — N-5, p.18—Can Anyone Use a Respirator?
6A vacant house is scheduled for structural fumigation. The owner uses a designated agent to arrange the work. Whose signature can satisfy the Occupant Fumigation Notice signature requirement?
- A.The fumigant distributor's sales representative
- B.The fumigation company's equipment supplier
- C.The local utility company's service technician
- D.The property owner's designated agentCorrect answer: D
Explanation: California Structural Pest Control Act and Regulations states:"(a) The prime contractor for fumigation must possess an Occupant Fumigation Notice and Pesticide Disclosure form (Form number 43M-48, revised 10/2022, which is hereby incorporated by reference) signed by the occupant, if any, or owner or owner's agent of a structure." The rule expressly permits the owner or owner's agent to sign. The other job-related roles do not establish that authorization.
Reference: California Structural Pest Control Act and Regulations — 16 CCR §1970.4(a)
7A home served by SoCalGas is scheduled for fumigation. The field representative needs to arrange operation of the natural gas service shut-off valve. Who is authorized under the utility's stated rule?
- A.The property owner or the property manager
- B.The fumigation company or its field representatives
- C.SoCalGas or its certified contractorsCorrect answer: C
- D.The appliance retailer or its delivery personnel
Explanation: SoCalGas—How to Prepare for Fumigation states:"Under the regulations of the California Public Utilities Commission (CPUC), only SoCalGas® or its certified contractors are authorized to operate the natural gas service shut-off valve. Fumigation contractors are not authorized to perform these services." The utility-specific condition is stated in the stem; a fumigation license alone does not authorize operation of this service valve.
Reference: SoCalGas—How to Prepare for Fumigation — How to Prepare for Fumigation—NOTE
8A terminal reading is used to assess ZYTHOR treatment efficacy. At a given measured concentration for the same target pest, which additional pair of exposure variables does the label identify as determining mortality?
- A.Relative humidity and outdoor wind speed
- B.Exposure-period length and temperatureCorrect answer: B
- C.Enclosure volume and ground-seal condition
- D.Tarpaulin condition and underseal characteristics
Explanation: ZYTHOR Gas Fumigant Label states:"Achieving target pest mortality with ZYTHOR is dependent upon the concentration of ZYTHOR present in the air the target pest is breathing. However, it is also dependent upon the length of the period of time the target pest is exposed to that concentration (exposure period) and the temperature." Exposure duration and temperature determine the lethal effect at the stated concentration. The other pairs affect enclosure conditions, gas retention, or dose planning and do not replace those direct exposure variables.
Reference: ZYTHOR Gas Fumigant Label — Determining Doses and Exposure Periods for ZYTHOR
9A CAP job used a low initial sulfuryl fluoride concentration, but the high ambient temperature for its aeration period is 35°F. What minimum aeration time does the cold-weather provision require?
- A.12 hours
- B.24 hoursCorrect answer: B
- C.20 hours
- D.16 hours
Explanation: California Aeration Plan for Structural Fumigations states:"When the high ambient temperature for the aeration period is below 40°F at the fumigation site, a minimum of 24 hours of aeration is required." 35°F is below 40°F, so the 24-hour minimum controls even when the dose-based table would otherwise give a shorter time.
Reference: California Aeration Plan for Structural Fumigations — p.333—Table2 footnote
10A fumigator's face shape and respirator model have not changed. What routine frequency does DPR N-5 require for fit testing while respirator use continues?
- A.Every yearCorrect answer: A
- B.Every six months
- C.Every three months
- D.Every two years
Explanation: DPR Pesticide Safety Information Series N states:"Fit testing must be done every year you have to wear a respirator, and any time there are changes to the way your face fits the respirator." Annual fit testing remains required without a fit change. Changes may trigger an additional test sooner.
Reference: DPR Pesticide Safety Information Series N — N-5, p.19—Fit Testing
Exam Review
About California Branch 1 Field Representative Written Examination
California Branch 1 Field Representative Written Examination · US-CA
Key exam facts
- Provider
- California Structural Pest Control Board (SPCB): responsible examination authority; Department of Consumer Affairs Office of Professional Examination Services (OPES): occupational analysis/content validation; PSI Services LLC: contracted examination delivery.
- Format
- Computer-delivered written examination at PSI test centers; the official handbook illustrates four-option, single-answer multiple-choice questions. No item-type percentage distribution is stated.
- Exam questions
- Total questions: 150.
- Time limit
- 2.5 hours of examination time. An introductory tutorial of up to 15 minutes is excluded from examination time.
- Passing score
- 70 percent. Business and Professions Code §8560(g) specifies a general average of not less than 70 percent on each subject of the applicable branch; the official handbook reports a 70-percent examination passing score.
- Exam fee
- USD 75 for the Field Representative examination application; USD 75 for re-examination after failure or nonattendance. Initial license application fee is separate.
Topics covered
Fumigation Preparation (29%)
- Verify that signed copy of Occupants Fumigation Notice is on site before starting fumigation preparation.
- Determine adjacent properties that may be affected by fumigation.
- Identify construction elements, conduits, or drains that could allow passage of fumigant to adjoining or connecting structures.
- Inspect areas of property to verify that landscaping is prepared to optimize ground seal.
- Inspect areas to be fumigated to ensure all people, pets, and plants have been removed.
- Inspect indoor areas to be fumigated to ensure all ingestible and medicinal items have been double-bagged or removed.
- Open interior subarea accesses, attic accesses, cabinets, drawers, closets, and appliances.
- Determine number and location of introduction sites and warning agent pans.
- Determine number and placement of fans.
- Set up monitoring equipment.
- Install secondary locks or barricade exterior entrances to prevent entry.
- Post fumigation warning signs on structures at entrances and on each side of structures.
- Determine placement of tarps and install tarps to cover structures.
- Seal tarp seams and ensure ground seals.
- Install aeration ducting and inlet devices.
- Post fumigation warning signs on exterior of tarps and joint seams.
Fumigation (17%)
- Verify that natural gas to property has been shut off.
- Determine amount of warning agent to be used according to manufacturer label.
- Calculate volume of area to be fumigated.
- Calculate dosage of fumigant to be used according to manufacturer label.
- Dispense warning agent into pans before introducing fumigant.
- Introduce fumigant into structure through introduction lines.
- Visually inspect structure for leaks during fumigation.
- Monitor concentration level of fumigant to determine actual half-loss time.
- Calculate amount of additional fumigant to be introduced into structures when excessive leakage occurs.
- Manage “blow opens” during fumigation.
Aeration (12%)
- Take terminal reading to confirm efficacy of the fumigation.
- Turn on aeration fans to facilitate ventilation of structures.
- Remove aeration duct covers from aeration ducting to facilitate ventilation of structures.
- Open fresh air intake inlets in tarps to facilitate ventilation of structures.
- Inspect the fumigation to ensure that aeration has not been compromised.
- Follow fumigant label aeration procedures.
Certification (17%)
- Verify that active aeration time has been achieved, and then turn off aeration fans.
- Remove ground seal and take down tarps.
- Ventilate the forced air ducts using HVAC system or circulation fans.
- Remove warning agent pans.
- Test breathing zones throughout structures to confirm fumigant concentration is at safe level.
- Remove secondary locks and barricades.
- Remove fumigation warning signs and post NOTICE OF RE-ENTRY sign.
- Post fumigation tags in accordance with regulations.
- Complete fumigation logs in accordance with Structural Pest Control Board requirements.
Safety (25%)
- Complete self-contained breathing apparatus (SCBA) and respiratory protection program training in accordance with laws and regulations.
- Complete CPR training in accordance with laws and regulations.
- Complete pesticide safety, label, and stewardship training in accordance with laws and regulations.
- Comply with requirements for the use of personal protective equipment (PPE).
- Comply with requirements for the use and inspection of self-contained breathing apparatus (SCBA).
- Identify and manage hazards that could impact worksite safety.
- Follow safety procedures when working on roofs.
- Inspect tarps for holes and tears to prevent fumigant leaks.
- Comply with laws and regulations for the handling and use of fumigants and warning agents.
- Comply with requirements for fumigation safety kits.
- Store fumigants and warning agents in accordance with laws and regulations.
- Ensure vehicles contain required equipment and emergency medical information.
How to prepare
Work through the topics, read the explanation after each answer, and revisit the areas where you miss questions. Use the official outline and reference materials below to guide your study.
These independent practice questions are not actual exam items and do not guarantee a passing result.
Frequently asked questions
What is the exam format?
Computer-delivered written examination at PSI test centers; the official handbook illustrates four-option, single-answer multiple-choice questions. No item-type percentage distribution is stated.
How many questions are on the exam?
Total questions: 150.
How long is the exam?
2.5 hours of examination time. An introductory tutorial of up to 15 minutes is excluded from examination time.
What is the passing score?
70 percent. Business and Professions Code §8560(g) specifies a general average of not less than 70 percent on each subject of the applicable branch; the official handbook reports a 70-percent examination passing score.
How much does the exam cost?
USD 75 for the Field Representative examination application; USD 75 for re-examination after failure or nonattendance. Initial license application fee is separate.
Official sources and references
- Branch 1 Field Representative Written Examination Candidate Handbook
printed p. 9, Examination Plan (Outline)
- Branch 1 Field Representative Written Examination Candidate Handbook
printed p. 9, content area 2
- Branch 1 Field Representative Written Examination Candidate Handbook
printed p. 9, content area 3
- Branch 1 Field Representative Written Examination Candidate Handbook
printed p. 9, content area 4
- Branch 1 Field Representative Written Examination Candidate Handbook
printed p. 9, content area 5
- SPCB Examination Regulations
16 CCR §1940(a)(2), p. 1
- SPCB Examination Regulations Final Statement of Reasons
p. 1, Updated Information
- 40 CFR §171.103, 2023 Edition
§171.103(c), p. 378
- SPCB Examination Regulations Initial Statement of Reasons
p. 4, existing examinations and federal competency standards
- Branch 1 Field Representative Written Examination Candidate Handbook
PDF p. 1
- Branch 1 Field Representative Written Examination Candidate Handbook
printed p. 8, Examination Results
- Branch 1 Field Representative Written Examination Candidate Handbook
printed p. 8, The Examination
- Branch 1 Field Representative Written Examination Candidate Handbook
printed p. 8, Tutorial
- SPCB Examinations
Field Representative Information, exam application
- Laws and Regulations Relating to the Practice of Structural Pest Control
BPC §8560(g)
Confirm current exam arrangements with the exam provider.