Free ACI certification examination for Tilt-Up Supervisor and Tilt-Up Technician Practice Questions
150 free questions · Answer explanations · No signup required
View examination details, outline and sourcesLoading selected examination banks…
Sample Practice Questions
Try these 10 sample questions from the ACI certification examination for Tilt-Up Supervisor and Tilt-Up Technician practice bank. Each includes the answer and explanation. Continue with the interactive practice above to review the full question set.
1During a tilt-up panel lift, the crane operator and signal person face in different directions. Under OSHA's construction crane signaling rule, whose perspective must the signal person use when giving directional instructions to the operator?
- A.The signal person's perspective
- B.The crane operator's perspectiveCorrect answer: B
- C.The lift director's perspective
- D.The rigger's perspective
Explanation: OSHA states: "All directions given to the operator by the signal person must be given from the operator's direction perspective." The signal person therefore uses the operator's perspective when giving directional instructions.
Reference: OSHA 29 CFR 1926.1419 — Signals—general requirements — 29 CFR 1926.1419(k)
2For an early tilt-up erection plan, the heaviest panel weighs 40 tons. Using the ACI/TCA preliminary rule of thumb for crane selection, what nominal crane capacity should the team consider?
- A.About 13.3 tons
- B.About 80 tons
- C.About 120 tonsCorrect answer: C
- D.About 160 tons
Explanation: TCA states that "three times the weight of the heaviest panel should be considered the crane capacity required." Multiplying 40 tons by three gives 120 tons as a preliminary rule-of-thumb estimate; the actual lift still requires a capacity assessment for its configuration.
Reference: TCA Collective Position on Recognizing and Controlling Ground Bearing Pressures for Erecting Tilt-Up Panels — The Current Industry
3A roof diaphragm transfers a total earthquake force of 40 kips to two vertical resisting walls. In a simplified load-path check, the first wall is assigned 25 kips. If the two walls carry the entire 40-kip force in the same direction, what force is assigned to the second wall?
- A.15 kipsCorrect answer: A
- B.25 kips
- C.40 kips
- D.65 kips
Explanation: FEMA states that "The floor and roof systems that distribute an earthquake’s lateral forces are referred to as diaphragms." Under the stated simplified load balance, the second wall receives 40 − 25 = 15 kips. Copying the first wall gives 25, assigning the whole load to the second gives 40, and adding 40 and 25 gives 65 kips.
Reference: FEMA IS-8.A Building for the Earthquakes of Tomorrow — Unit 4 — Unit 4, Diaphragms
4A supervisor estimates soil bearing pressure for a concentrically loaded panel footing. The vertical load is 40,000 lb, and the effective bearing area is 4 ft by 5 ft. Assuming uniform pressure and ignoring footing self-weight, what is the average bearing pressure?
- A.1,000 lb/ft²
- B.2,000 lb/ft²Correct answer: B
- C.8,000 lb/ft²
- D.10,000 lb/ft²
Explanation: FHWA illustrates bearing stress as "q applied = P ÷ A ′". Here the area is 4 × 5 = 20 ft², and 40,000 ÷ 20 = 2,000 lb/ft². The estimate alone does not establish whether the footing meets its design requirements.
Reference: FHWA Geotechnical Engineering Circular No. 6 — Shallow Foundations — Appendix B, Example 1, Step 10, p. B-14
5The crew saws a weakened plane into a slab-on-grade to guide where cracking from dimensional change occurs. Which type of joint has this purpose?
- A.Construction joint
- B.Contraction jointCorrect answer: B
- C.Isolation joint
- D.Expansion joint
Explanation: ACI describes a contraction joint as a groove made "to create a weakened plane to regulate the location of cracking" from dimensional change. The other choices are different joint types with different primary purposes.
Reference: ACI Technical Questions — Difference between concrete joint types — Answer, contraction joint
6A forming crew needs to produce a beveled edge on a tilt-up panel by placing an insert in an inside form corner. Which item is intended for this purpose?
- A.Bolster strip
- B.Chamfer stripCorrect answer: B
- C.Reveal strip
- D.Closure strip
7A panel mixture must maintain its specified slump with less mixing water, apart from any effect of entrained air. Which ACI admixture classification is defined by that water-reduction effect?
- A.Retarding admixture
- B.Air-entraining admixture
- C.Water-reducing admixtureCorrect answer: C
- D.Accelerating admixture
8A tilt-up supervisor checks embedded lifting inserts for a panel under OSHA's precast concrete construction rule. What is the minimum required insert capacity as a multiple of the maximum intended load transmitted to the inserts?
- A.2 timesCorrect answer: A
- B.4 times
- C.5 times
- D.10 times
Explanation: OSHA requires tilt-up lifting inserts to support "at least two times the maximum intended load applied or transmitted to them." Two is the minimum multiplier; greater capacities can satisfy the minimum but are not the minimum itself.
Reference: OSHA 29 CFR 1926.704 — Requirements for precast concrete — 29 CFR 1926.704(b)
9A panel finish specification calls for an elastic polymer paint that behaves like a rubber-like membrane to span cracks and reduce permeability. What type of paint does ACI's tilt-up guide describe this way?
- A.Cement paint
- B.Epoxy paint
- C.Silicate paint
- D.Elastomeric paintCorrect answer: D
Explanation: ACI defines "elastomeric paint" as an elastic polymer paint that behaves as "a rubber-like membrane on the concrete surface to span cracks and decrease permeability." That description matches the specified finish.
Reference: ACI 551.1R-14 Guide to Tilt-Up Concrete Construction — Chapter 2, Definitions, elastomeric paint
10A tilt-up lift is planned near an energized overhead line confirmed to be 200 kV nominal alternating current. The employer uses the Table A clearance option under OSHA's construction crane rule. What is the minimum clearance from the line for the equipment, load line and load?
- A.10 feet
- B.15 feetCorrect answer: B
- C.20 feet
- D.25 feet
Explanation: Table A lists "over 50 to 200" kV with a clearance of "15" feet. The table note says the upper value "includes that value"; therefore 200 kV falls in the 15-foot row. The option's other required precautions also apply.
Reference: OSHA 29 CFR 1926.1408 — Power line safety (up to 350 kV) — 29 CFR 1926.1408, Table A
Exam Review
About ACI certification examination for Tilt-Up Supervisor and Tilt-Up Technician
ACI certification examination for Tilt-Up Supervisor and Tilt-Up Technician · US
Key exam facts
- Provider
- American Concrete Institute; authorized sponsoring groups and listed Prometric Testing Centers
- Format
- Closed-book written examination; multiple-choice or true/false; verbal administration requires ACI approval
- Time limit
- Maximum two hours
- Passing score
- Minimum 70%
Topics covered
Safety Communications and Procedures
Planning and Scheduling
Structural Systems
Site Preparation and Foundations
Slabs on Grade
Layout and Forming
Concrete Properties and Placement
Erection and Bracing
Panel Finishes and Building Finishing
How to prepare
Work through the topics, read the explanation after each answer, and revisit the areas where you miss questions. Use the official outline and reference materials below to guide your study.
These independent practice questions are not actual exam items and do not guarantee a passing result.
Frequently asked questions
What is the exam format?
Closed-book written examination; multiple-choice or true/false; verbal administration requires ACI approval
How long is the exam?
Maximum two hours
What is the passing score?
Minimum 70%
Official sources and references
- ACI CPP 650.1-26
PDF p. 3, section 4.01; Annex 650.1-1, PDF pp. 7-10
- ACI Tilt-Up JTA
PDF p. 1, introduction; complete nine-area scope pp. 1-4
- ACI Tilt-Up program
Scope and Knowledge
- ACI CPP 650.1-26
PDF p. 4, section 4.04
- ACI CPP 650.1-26
PDF p. 4, section 4.05
- ACI CPP 650.1-26
PDF p. 4, section 4.06
- ACI CPP 650.1-26
PDF p. 4, section 4.07
- ACI CPP 650.1-26
PDF p. 4, section 4.08
- ACI Prometric sponsoring group listing
Prometric Testing Centers, Programs Run
- ACI Prometric sponsoring group listing
ACI RESOURCE CENTERS
- ACI CPP 650.1-26
PDF p. 2, section 2.03
- ACI November 25 event
Tilt Up Technician / Supervisor, session description
- ACI CP-50 English workbook listing
Description