OpenExamsFREE PRACTICE — ANY EXAM

Water Well Driller — Information & Free Practice

US-WI · Examination information

112 free questions · Answer explanations · No signup required

Start free practice →

Water Well Driller

Provider
Wisconsin Department of Natural Resources
Format
In-person paper examination; open code; multiple-choice and true/false questions.
Exam questions
100
Time limit
Up to three hours in a DNR examination session.
Passing score
75%
Exam fee
$50
Practice scope

The authority has not published an examination outline; the practice questions follow the scope of the existing question bank.

  • Professional Licensing and Responsibilities
    • 1.1.1 Purpose and applicability
    • 1.2.1 Definitions
    • 1.3.1 Exceptions to individual water well driller license requirements
    • 1.4.1 Water well driller business registration
    • 1.4.2 Exceptions to water well driller business registration requirements
    • 1.5.1 Supervisory water well driller responsibilities
    • 1.6.1 Well filling and sealing license and registration requirements
    • 1.7.1 Conditions
    • 1.8.1 License and registration renewal application process
    • 1.8.2 License and registration renewal eligibility
    • 1.8.3 Continuing education requirements
    • 1.9.1 Responsibilities
    • 1.10.1 Basis for suspension or revocation
    • 1.10.2 Limitations on suspended or revoked credentials
    • 1.10.3 Reinstatement
    • 1.11.1 Well filling and sealing requirements
    • 1.12.1 Property transfer well inspections
    • 1.13.1 Appropriate action and stepped enforcement
  • Community Water System Scope and Approval
    • 2.1.1 When a water system is a community well
    • 2.2.1 Approval requirements
  • Well Construction and Compliance
    • 3.1.1 Applicability to water systems and drillholes
    • 3.2.1 Cooperation with the department
    • 3.3.1 Conforming work and exceptions
    • 3.4.1 Well and water system definitions
    • 3.5.1 Location requirements and Table A
    • 3.6.1 Activities requiring approvals
    • 3.6.2 Application submission and approval
    • 3.7.1 Product and component approvals
    • 3.8.1 Preconstruction responsibilities
    • 3.8.2 Water samples and well construction reports
    • 3.8.3 Post-construction correction responsibilities
    • 3.9.1 Well construction equipment and materials
    • 3.10.1 Preconstruction planning
    • 3.10.2 Construction during drilling
    • 3.10.3 Post-drilling construction
    • 3.10.4 Finishing operations
    • 3.11.1 Unconsolidated drillhole diameter and casing depth
    • 3.11.2 Casing, screens and gravel packs
    • 3.11.3 Upper enlarged drillholes and grouting
    • 3.12.1 Bedrock drillhole diameter and casing depth
    • 3.12.2 Bedrock casing materials and driving restrictions
    • 3.12.3 Upper enlarged and lower drillholes
    • 3.12.4 Bedrock grouting
    • 3.13.1 General flowing-well construction
    • 3.13.2 Flowing wells in unconsolidated formations
    • 3.13.3 Flowing wells in bedrock
    • 3.14.1 Potable high-capacity well dimensions and casing
    • 3.14.2 High-capacity well grouting and casing advancement
    • 3.14.3 High-capacity well screens and gravel packs
    • 3.14.4 High-capacity well geologic samples
    • 3.15.1 Screened wells with gravel packs
    • 3.15.2 Gravel-pack placement
    • 3.16.1 Welding procedures
    • 3.17.1 Plumbness and alignment
    • 3.18.1 Grouting and sealing annular spaces
    • 3.19.1 Liners
    • 3.20.1 Well rehabilitation
    • 3.20.2 Batch chlorination
    • 3.21.1 Driven point wells
    • 3.22.1 Dug wells
    • 3.23.1 Springs as potable sources
    • 3.24.1 When filling and sealing is required
    • 3.24.2 Filling and sealing methods
    • 3.24.3 Filling and sealing reports
    • 3.25.1 Vermin-proof caps and seals
    • 3.26.1 Pits and driveway ramps
    • 3.27.1 Water treatment
    • 3.28.1 Existing location and construction
    • 3.28.2 Existing water quality
    • 3.28.3 Existing pits and alcoves
    • 3.28.4 Existing reservoirs
    • 3.28.5 Existing dug wells
    • 3.28.6 Pump and discharge piping evaluation
    • 3.28.7 Casing height and extensions
    • 3.28.8 Existing caps and seals
    • 3.28.9 Basement wells
    • 3.28.10 Work on existing installations
    • 3.29.1 Variance applicant responsibilities
    • 3.29.2 Department variance authority
    • 3.29.3 Landfill variances
    • 3.29.4 Bedrock casing-depth variance
    • 3.30.1 Property-transfer inspection scope
    • 3.30.2 Property-transfer inspector licensing
    • 3.30.3 Inspection forms and sampling
    • 3.30.4 Evaluation criteria
    • 3.31.1 Citations
    • 3.32.1 Sampling, analysis and reporting
  • Wisconsin Geologic Conditions
    • 4.1.1 Glacial geology
    • 4.2.1 Bedrock geology
    • 4.2.2 Stratigraphic bedrock units
    • 4.2.3 Limestone and dolomite
    • 4.2.4 Sandstone
    • 4.2.5 Shale
    • 4.2.6 Precambrian basement rock
    • 4.3.1 Importance of drill cuttings
    • 4.3.2 Cuttings collection methods
    • 4.4.1 Aquifer
    • 4.4.2 Specific capacity and well yield
    • 4.4.3 Groundwater flow
    • 4.4.4 Groundwater flow map
  • Drilling, Development, and Reporting
    • 5.1.1 Siting a well
    • 5.2.1 Mud rotary
    • 5.2.2 Air rotary
    • 5.2.3 Cable-tool advantages
    • 5.2.4 Power chisel
    • 5.2.5 Bailer
    • 5.2.6 Pile driver
    • 5.2.7 Casing hammer
    • 5.2.8 Dual rotary
    • 5.2.9 Screen installation
    • 5.2.10 Well development
    • 5.2.11 Overpumping
    • 5.2.12 Surging
    • 5.2.13 Jetting
    • 5.2.14 Blasting
    • 5.2.15 Acidification
    • 5.2.16 Hydrofracturing
    • 5.3.1 Flowing wells
    • 5.3.2 Jetting methods
    • 5.4.1 Special casing-depth areas
    • 5.5.1 Water as drilling fluid
    • 5.5.2 Sodium bentonite slurry
    • 5.5.3 Drilling foam
    • 5.5.4 Other additives
    • 5.6.1 Fluid and additive selection
    • 5.7.1 Make-up water
    • 5.8.1 Well construction reporting
    • 5.8.2 Filling and sealing reporting
    • 5.8.3 Sampling reporting
    • 5.8.4 Compliance inspection report
    • 5.8.5 Property-transfer report
    • 5.9.1 Public Land Survey System
    • 5.10.1 GPS location reporting
    • 5.10.2 Well Driller Viewer
    • 5.11.1 Disinfection
    • 5.11.2 Bleach concentration and pH
    • 5.12.1 Removing residual chlorine
    • 5.12.2 Arsenic and metals sampling
    • 5.13.1 Why filling and sealing matters
    • 5.13.2 Stuck pump removal
    • 5.13.3 Bentonite chip volume
  • Annular Sealing Methods
    • 6.1.1 Grout uses and characteristics
    • 6.2.1 Straight and in-gage drillhole
    • 6.3.1 Sealant materials
    • 6.4.1 Tremie pipe method
    • 6.4.2 Bradenhead method
    • 6.4.3 Grout shoe method
  • Field Calculations
    • 7.1.1 Grout calculation
Examination sources

Related license preparation

This examination may be required or accepted as an alternative, depending on the license and application pathway.