About California Architects Board California Supplemental Examination

California Architects Board California Supplemental Examination · US-CA

Key exam facts

Provider
California Architects Board (CAB) is responsible for the examination; the Office of Professional Examination Services (OPES) develops and maintains it; PSI administers it under contract through California DCA.
Format
Computer-delivered multiple-choice examination at PSI test centers, with one correct answer per item.
Exam questions
Scored questions: 100.
Time limit
Approximately 3.5 hours of answering time. The introductory tutorial, up to 15 minutes, is excluded; restroom breaks do not add time. Approved ESL accommodations provide a 45-minute extension.
Passing score
Criterion-referenced pass/fail standard based on minimum competence for safe entry-level California architectural practice. The handbook's complete scoring section does not publish a numerical cut score, percentage, or scaled-score threshold.
Exam fee
USD 100 per CSE attempt payable to CAB; each retake requires a new application and fee. This excludes separate eligibility evaluation and licensure application fees.

Topics covered

  • Contract Development / Project Planning (25%)

    • Knowledge of Architects Practice Act and California Code of Regulations related to architect business and professional requirements.
    • Knowledge of various agency impacts to project scopes and schedules.
    • Knowledge of architect and project team contractual roles and responsibilities.
    • Knowledge of methods for evaluating project requirements, constraints, resources, and contractual risks.
    • Knowledge of types of contracts and their application to scope of work and project service requirements.
    • Knowledge of methods for determining regulatory agencies having jurisdiction over projects and their specific requirements.
    • Knowledge of different types of consultants and services provided, and how they relate to meeting project requirements.
    • Knowledge of types of project funding sources, their impact on project scopes, and additional requirements.
    • Knowledge of strategies for managing project and contractual risk.
    • Knowledge of architect and project team roles and responsibilities in all phases of projects.
    • Knowledge of methods for coordinating with owner-contracted consultants.
    • Knowledge of standards and procedures for documenting approvals and submitting contractual milestones.
    • Knowledge of conflict resolution principles and techniques.
    • Knowledge of methods for project scheduling in all phases of projects.
  • Schematic Design / Discretionary Approvals (30%)

    • Knowledge of methods for developing and evaluating design programs to determine code compliance, feasibility, and conformance to project requirements.
    • Knowledge of methods for developing design solutions with involvement of clients, users, consultants, and stakeholders.
    • Knowledge of procedures for obtaining data about existing conditions and determining project impacts.
    • Knowledge of environmental conditions regulated in California and the impacts/mitigation measures related to design and construction.
    • Knowledge of processes and procedures for obtaining discretionary approvals.
    • Knowledge of procedures for complying with local codes and ordinances related to design and construction.
    • Knowledge of methods and procedures for complying with California Environmental Quality Act (CEQA) as it relates to design and construction.
    • Knowledge of methods and procedures for complying with California Coastal Act as it relates to design and construction.
    • Knowledge of methods and procedures for complying with California Clean Air Act related to design and construction.
    • Knowledge of methods and procedures for complying with state regulatory requirements related to the design and construction of hospitals, public schools, fire/police stations, and other essential services buildings.
    • Knowledge of methods and procedures for complying with California Building Standards Code related to design and construction.
    • Knowledge of methods and procedures for complying with California Health and Safety Code related to design and construction.
    • Knowledge of methods and procedures for complying with California water quality regulations related to design and construction.
    • Knowledge of methods and procedures for complying with California Green Building Standards Code (CALGreen) related to design and construction.
    • Knowledge of methods and procedures for complying with Americans with Disabilities Act (ADA) guidelines related to access compliance.
    • Knowledge of methods and procedures for complying with California Accessibility regulations related to access compliance.
    • Knowledge of contents of design drawings and related documents required for discretionary approvals.
    • Knowledge of architect role and responsibilities in leading project team to obtain discretionary approvals.
  • Design Development (15%)

    • Knowledge of methods and procedures for evaluating and integrating building systems and utilities into the project design.
    • Knowledge of methods and procedures for evaluating building materials and equipment.
    • Knowledge of methods for identifying and evaluating the implications of special conditions on design and construction (e.g., seismic zones, fire severity zones, flood zones, wind).
    • Knowledge of methods for analyzing initial and life cycle costs to select materials and systems for projects.
    • Knowledge of methods for evaluating and reviewing energy analysis for compliance with California regulations.
  • Construction Documents / Permitting (10%)

    • Knowledge of methods and procedures for managing distribution and review of documents during construction document and permitting phases.
    • Knowledge of contents of contract documents required for agency approval, bidding, and construction.
    • Knowledge of methods for the detailed integration of building systems and constructability.
    • Knowledge of processes and procedures for working with regulatory agencies having jurisdiction over projects to obtain final approvals.
    • Knowledge of interrelationships between regulatory agencies and their impact on the approval process (e.g., sequence of approvals, hierarchy of jurisdictions).
    • Knowledge of architect role in resolving conflicts between agencies regarding conflicting codes, regulations, and standards.
  • Project Bidding and Construction (20%)

    • Knowledge of methods and procedures for preparing bidding documents based on project funding source and delivery method.
    • Knowledge of provisions of California Public Contract Code related to bidding and contracting for publicly funded projects.
    • Knowledge of California laws related to liens and implications for architect and client responsibilities.
    • Knowledge of methods and procedures for implementing changes during construction.
    • Knowledge of methods and procedures for the preparation and submittal of construction change documents for regulatory approval.
    • Knowledge of methods and procedures for processing deferred submittals for agency approval.
    • Knowledge of protocols for contractor application for payment.
    • Knowledge of procedures for performing project close-out.
    • Knowledge of California law related to minimum construction warranty periods.
    • Knowledge of code-required special inspections and testing.
    • Knowledge of state inspection, testing, reporting, and documentation requirements for construction of hospitals, public schools, and essential services buildings.
    • Knowledge of construction manager impact on construction administration services.
    • Knowledge of procedures for reviewing shop drawings, submittals, and samples.
    • Knowledge of post-construction services in accordance with contracts.
    • Knowledge of construction industry standards and detailing.

How to prepare

Work through the topics, read the explanation after each answer, and revisit the areas where you miss questions. Use the official outline and reference materials below to guide your study.

These independent practice questions are not actual exam items and do not guarantee a passing result.

Frequently asked questions

What is the exam format?

Computer-delivered multiple-choice examination at PSI test centers, with one correct answer per item.

How many questions are on the exam?

Scored questions: 100.

How long is the exam?

Approximately 3.5 hours of answering time. The introductory tutorial, up to 15 minutes, is excluded; restroom breaks do not add time. Approved ESL accommodations provide a 45-minute extension.

What is the passing score?

Criterion-referenced pass/fail standard based on minimum competence for safe entry-level California architectural practice. The handbook's complete scoring section does not publish a numerical cut score, percentage, or scaled-score threshold.

How much does the exam cost?

USD 100 per CSE attempt payable to CAB; each retake requires a new application and fee. This excludes separate eligibility evaluation and licensure application fees.